A system study on the production department of JLC Printing Company

Executive Summary. JLC Printing Company is a manufacturing company engaged in the printing business. A study on the present system of their production processes in the context of People, Raw Materials, Information flow, Machinery, Equipment and Utilities was done. Thorough the use of a WOT-SURG anal...

Full description

Saved in:
Bibliographic Details
Main Authors: Lim, Jonathan Andrew, Limchu, Jerry, Torno, Valerie Kristel
Format: text
Language:English
Published: Animo Repository 2001
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/12018
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-12663
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-126632021-09-12T05:51:17Z A system study on the production department of JLC Printing Company Lim, Jonathan Andrew Limchu, Jerry Torno, Valerie Kristel Executive Summary. JLC Printing Company is a manufacturing company engaged in the printing business. A study on the present system of their production processes in the context of People, Raw Materials, Information flow, Machinery, Equipment and Utilities was done. Thorough the use of a WOT-SURG analysis it was uncovered that JLC Printing Company experienced a 6% Excess on the 10% Raw Material Scrap allowance, amounting to P 474,451.17 for the year 2000. To minimize the percentage of scrap cost with respect to the company's sales, the causes of excess raw material scrap must be eliminated or minimized. After validating the causes by obtaining segregated scrap data from March to May of 2001 and using the Pareto analysis, it was found out that the major contributors to excess scrap are the paper jam on both Offset and Vertical Letterpress printing machines, poor material handling, too much / not enough ink in the offset machine, wrong mixture of color, and being unable to stop the Minerva Letterpress Machine. In order to achieve the objective of the study, which is to meet the 10% raw material scrap allowance, a new system which contains the following was proposed: Changing of the suction cups, for the Offset and Vertical letterpress machine, every two weeks instill a 5 S Program constant checking of the offset machine's output Color Chart System and to fabricate and install a foot pedal onto the Minerva Letterpress Machine. The proposed solution would result to a net benefit of about P 570,000.00 a year and the percentage of raw materials scrap cost with respect to the company's sales is lowered to about 8%. 2001-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/12018 Bachelor's Theses English Animo Repository
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
description Executive Summary. JLC Printing Company is a manufacturing company engaged in the printing business. A study on the present system of their production processes in the context of People, Raw Materials, Information flow, Machinery, Equipment and Utilities was done. Thorough the use of a WOT-SURG analysis it was uncovered that JLC Printing Company experienced a 6% Excess on the 10% Raw Material Scrap allowance, amounting to P 474,451.17 for the year 2000. To minimize the percentage of scrap cost with respect to the company's sales, the causes of excess raw material scrap must be eliminated or minimized. After validating the causes by obtaining segregated scrap data from March to May of 2001 and using the Pareto analysis, it was found out that the major contributors to excess scrap are the paper jam on both Offset and Vertical Letterpress printing machines, poor material handling, too much / not enough ink in the offset machine, wrong mixture of color, and being unable to stop the Minerva Letterpress Machine. In order to achieve the objective of the study, which is to meet the 10% raw material scrap allowance, a new system which contains the following was proposed: Changing of the suction cups, for the Offset and Vertical letterpress machine, every two weeks instill a 5 S Program constant checking of the offset machine's output Color Chart System and to fabricate and install a foot pedal onto the Minerva Letterpress Machine. The proposed solution would result to a net benefit of about P 570,000.00 a year and the percentage of raw materials scrap cost with respect to the company's sales is lowered to about 8%.
format text
author Lim, Jonathan Andrew
Limchu, Jerry
Torno, Valerie Kristel
spellingShingle Lim, Jonathan Andrew
Limchu, Jerry
Torno, Valerie Kristel
A system study on the production department of JLC Printing Company
author_facet Lim, Jonathan Andrew
Limchu, Jerry
Torno, Valerie Kristel
author_sort Lim, Jonathan Andrew
title A system study on the production department of JLC Printing Company
title_short A system study on the production department of JLC Printing Company
title_full A system study on the production department of JLC Printing Company
title_fullStr A system study on the production department of JLC Printing Company
title_full_unstemmed A system study on the production department of JLC Printing Company
title_sort system study on the production department of jlc printing company
publisher Animo Repository
publishDate 2001
url https://animorepository.dlsu.edu.ph/etd_bachelors/12018
_version_ 1772835007084101632