A systems study on the production department of Miyata Corporation

Executive Summary. Manufacturing firms experience and face different kinds of problems in their way of producing or manufacturing their products. In the production stage of the company, the proponents notice lots of deviation from what is expected to be the outcome. Many times, the proponents really...

Full description

Saved in:
Bibliographic Details
Main Authors: Inumerable, Ivan, Tomelden, Gene
Format: text
Language:English
Published: Animo Repository 2000
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/12028
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-12673
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-126732021-09-16T08:31:43Z A systems study on the production department of Miyata Corporation Inumerable, Ivan Tomelden, Gene Executive Summary. Manufacturing firms experience and face different kinds of problems in their way of producing or manufacturing their products. In the production stage of the company, the proponents notice lots of deviation from what is expected to be the outcome. Many times, the proponents really cannot pinpoint the problem unless tools would be used and that a thorough analysis and a study would be undertaken. The proponents then made a study on the karaoke products being manufactured by Miyata Company (Janito Corporation) from January to December of year 1999. We focused on their production of Cinema I and Cinema II model karaoke in their Antipolo factory. The study was made in order to have a better way of improving the present manufacturing process of the company. Systems study made us pinpoint the deviation from what is expected in the production of Cinema I and Cinema II karaoke. With the use and aid of Industrial Engineering Techniques and Tools, the proponents provided the background for the Production Department of Miyata Karaoke regarding the manufacturing of Cinema I and Cinema II karaoke. Then, the proponents determined the main problem in their production process, which is underproduction of Cinema I and II karaoke. The causes of this underproduction are the reworks done on the defective karaoke and the lacking of raw materials to produce karaoke. After using IE tools, we formulated and came up with solutions (the adding of Styrofoam to the packaging of karaoke, and the use of simple scheduling in acquiring the raw materials) in order to solve the problem in underproduction by the department. The implementation of the solution will benefit the company a total amount of Php 8,257,340 in the next five years with a cost of Php 396,800 and benefit of Php 1,651,468 per year. 2000-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/12028 Bachelor's Theses English Animo Repository
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
description Executive Summary. Manufacturing firms experience and face different kinds of problems in their way of producing or manufacturing their products. In the production stage of the company, the proponents notice lots of deviation from what is expected to be the outcome. Many times, the proponents really cannot pinpoint the problem unless tools would be used and that a thorough analysis and a study would be undertaken. The proponents then made a study on the karaoke products being manufactured by Miyata Company (Janito Corporation) from January to December of year 1999. We focused on their production of Cinema I and Cinema II model karaoke in their Antipolo factory. The study was made in order to have a better way of improving the present manufacturing process of the company. Systems study made us pinpoint the deviation from what is expected in the production of Cinema I and Cinema II karaoke. With the use and aid of Industrial Engineering Techniques and Tools, the proponents provided the background for the Production Department of Miyata Karaoke regarding the manufacturing of Cinema I and Cinema II karaoke. Then, the proponents determined the main problem in their production process, which is underproduction of Cinema I and II karaoke. The causes of this underproduction are the reworks done on the defective karaoke and the lacking of raw materials to produce karaoke. After using IE tools, we formulated and came up with solutions (the adding of Styrofoam to the packaging of karaoke, and the use of simple scheduling in acquiring the raw materials) in order to solve the problem in underproduction by the department. The implementation of the solution will benefit the company a total amount of Php 8,257,340 in the next five years with a cost of Php 396,800 and benefit of Php 1,651,468 per year.
format text
author Inumerable, Ivan
Tomelden, Gene
spellingShingle Inumerable, Ivan
Tomelden, Gene
A systems study on the production department of Miyata Corporation
author_facet Inumerable, Ivan
Tomelden, Gene
author_sort Inumerable, Ivan
title A systems study on the production department of Miyata Corporation
title_short A systems study on the production department of Miyata Corporation
title_full A systems study on the production department of Miyata Corporation
title_fullStr A systems study on the production department of Miyata Corporation
title_full_unstemmed A systems study on the production department of Miyata Corporation
title_sort systems study on the production department of miyata corporation
publisher Animo Repository
publishDate 2000
url https://animorepository.dlsu.edu.ph/etd_bachelors/12028
_version_ 1712577587096584192