A system study on the viscous liquid production department of JAD Company, Inc.

Executive Summary. This study is concerned with the system study on the viscous liquid production department of JAD Company Incorporated. The problem being addressed is the raw material loss of 5.12% that exceeds the allowable limit of 3% for JAD's production system of viscous liquids from Oct....

Full description

Saved in:
Bibliographic Details
Main Authors: Lee, Cheryl T., Ng, Deanna Farah T., Uyecio, Rochelle O.
Format: text
Language:English
Published: Animo Repository 2001
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/12087
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-12732
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-127322021-09-17T02:01:16Z A system study on the viscous liquid production department of JAD Company, Inc. Lee, Cheryl T. Ng, Deanna Farah T. Uyecio, Rochelle O. Executive Summary. This study is concerned with the system study on the viscous liquid production department of JAD Company Incorporated. The problem being addressed is the raw material loss of 5.12% that exceeds the allowable limit of 3% for JAD's production system of viscous liquids from Oct. 1999 to September 2000. It is a serious and urgent problem because this entails cost for JAD production. The system management and these writers believe that they have significant time and resources to solve this problem. The problem has the following specifications: What: the raw material loss pertains to the bulk loss in the production of viscous liquids. The bulk is the mixture after all raw materials are mixed in the SJKs. Where: the loss happens when the expected output is larger than the actual output. When: the loss has been occurring since the start of production of viscous liquids. How Much: the average loss is 5.12% Its initial causes are: 1. Flashing 2. Lack of storage kettles 3. Lack of bottles 4. Wrong measurement of raw materials 5. Wrong production 6. Spillage or mishandling The following are recommended to fully solve the problem: 1. Improve production policies and sequence scheduling 2. Improve communication and visual tools of the production supervisor and production area These solutions are expected to result to the following: An initial capital investment of Php 63,052.20, additional operating expense of Php 14,867.04 annually 3. Qualitative benefits of additional monitoring of production area, improve its ability to schedule job orders, instill discipline and responsibility to the planner and supervisor, accessibility of the information needed by the production area workers, easier comprehension of the on-goings of production area. This implementation of the recommended solutions is proposed to start on September 10, 2001 for the trial run and on February 10, 2001 for the final implementation. 2001-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/12087 Bachelor's Theses English Animo Repository
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
description Executive Summary. This study is concerned with the system study on the viscous liquid production department of JAD Company Incorporated. The problem being addressed is the raw material loss of 5.12% that exceeds the allowable limit of 3% for JAD's production system of viscous liquids from Oct. 1999 to September 2000. It is a serious and urgent problem because this entails cost for JAD production. The system management and these writers believe that they have significant time and resources to solve this problem. The problem has the following specifications: What: the raw material loss pertains to the bulk loss in the production of viscous liquids. The bulk is the mixture after all raw materials are mixed in the SJKs. Where: the loss happens when the expected output is larger than the actual output. When: the loss has been occurring since the start of production of viscous liquids. How Much: the average loss is 5.12% Its initial causes are: 1. Flashing 2. Lack of storage kettles 3. Lack of bottles 4. Wrong measurement of raw materials 5. Wrong production 6. Spillage or mishandling The following are recommended to fully solve the problem: 1. Improve production policies and sequence scheduling 2. Improve communication and visual tools of the production supervisor and production area These solutions are expected to result to the following: An initial capital investment of Php 63,052.20, additional operating expense of Php 14,867.04 annually 3. Qualitative benefits of additional monitoring of production area, improve its ability to schedule job orders, instill discipline and responsibility to the planner and supervisor, accessibility of the information needed by the production area workers, easier comprehension of the on-goings of production area. This implementation of the recommended solutions is proposed to start on September 10, 2001 for the trial run and on February 10, 2001 for the final implementation.
format text
author Lee, Cheryl T.
Ng, Deanna Farah T.
Uyecio, Rochelle O.
spellingShingle Lee, Cheryl T.
Ng, Deanna Farah T.
Uyecio, Rochelle O.
A system study on the viscous liquid production department of JAD Company, Inc.
author_facet Lee, Cheryl T.
Ng, Deanna Farah T.
Uyecio, Rochelle O.
author_sort Lee, Cheryl T.
title A system study on the viscous liquid production department of JAD Company, Inc.
title_short A system study on the viscous liquid production department of JAD Company, Inc.
title_full A system study on the viscous liquid production department of JAD Company, Inc.
title_fullStr A system study on the viscous liquid production department of JAD Company, Inc.
title_full_unstemmed A system study on the viscous liquid production department of JAD Company, Inc.
title_sort system study on the viscous liquid production department of jad company, inc.
publisher Animo Repository
publishDate 2001
url https://animorepository.dlsu.edu.ph/etd_bachelors/12087
_version_ 1772834910466211840