A system study of the production of garters at Les Products Co., Inc.

Executive Summary. This study is concerned with the Systems Study of the Production of Les Products Company, Inc. The problem being addressed is the company's inability to meet the customer's demand of 21.84%. It is a serious and urgent problem because monthly opportunity losses amount to...

Full description

Saved in:
Bibliographic Details
Main Authors: Chan, Ryan Henricson, Foronda, Andre, Marban, Eduardo Ewaldo
Format: text
Language:English
Published: Animo Repository 2002
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/12088
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-12733
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-127332021-09-17T02:04:20Z A system study of the production of garters at Les Products Co., Inc. Chan, Ryan Henricson Foronda, Andre Marban, Eduardo Ewaldo Executive Summary. This study is concerned with the Systems Study of the Production of Les Products Company, Inc. The problem being addressed is the company's inability to meet the customer's demand of 21.84%. It is a serious and urgent problem because monthly opportunity losses amount to as much as Php 105,450.00. The system management believes that they have significant time and resources to solve this problem. The main causes for the inability to meet the demand are breakdown of machines, stoppages, thread line rejects and inconsistent width rejects. All of these causes when combined constitutes 80% of the problem which when solved can address the rest of the 20% of the causes. The proposed solution to solve the problem is to hire additional technical personnel and to adopt a regular preventive maintenance program for the production department. It will not change any existing activities in the flow process but rather, it would require additional responsibilities and duties to some of the personnel in the company. This solution is expected to result to an increase of profit by Php 531,450.00 per year. The production would also have an increase in output of 19,686 rolls when compared to the demand of garter. It also would result to a qualitative benefit of being able to meet the customer deadlines. The implementation of the recommended solution is proposed to start as soon as possible that will last for approximately 3 months as a trial run. Evaluation will be done for 6 days by the group. 2002-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/12088 Bachelor's Theses English Animo Repository
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
description Executive Summary. This study is concerned with the Systems Study of the Production of Les Products Company, Inc. The problem being addressed is the company's inability to meet the customer's demand of 21.84%. It is a serious and urgent problem because monthly opportunity losses amount to as much as Php 105,450.00. The system management believes that they have significant time and resources to solve this problem. The main causes for the inability to meet the demand are breakdown of machines, stoppages, thread line rejects and inconsistent width rejects. All of these causes when combined constitutes 80% of the problem which when solved can address the rest of the 20% of the causes. The proposed solution to solve the problem is to hire additional technical personnel and to adopt a regular preventive maintenance program for the production department. It will not change any existing activities in the flow process but rather, it would require additional responsibilities and duties to some of the personnel in the company. This solution is expected to result to an increase of profit by Php 531,450.00 per year. The production would also have an increase in output of 19,686 rolls when compared to the demand of garter. It also would result to a qualitative benefit of being able to meet the customer deadlines. The implementation of the recommended solution is proposed to start as soon as possible that will last for approximately 3 months as a trial run. Evaluation will be done for 6 days by the group.
format text
author Chan, Ryan Henricson
Foronda, Andre
Marban, Eduardo Ewaldo
spellingShingle Chan, Ryan Henricson
Foronda, Andre
Marban, Eduardo Ewaldo
A system study of the production of garters at Les Products Co., Inc.
author_facet Chan, Ryan Henricson
Foronda, Andre
Marban, Eduardo Ewaldo
author_sort Chan, Ryan Henricson
title A system study of the production of garters at Les Products Co., Inc.
title_short A system study of the production of garters at Les Products Co., Inc.
title_full A system study of the production of garters at Les Products Co., Inc.
title_fullStr A system study of the production of garters at Les Products Co., Inc.
title_full_unstemmed A system study of the production of garters at Les Products Co., Inc.
title_sort system study of the production of garters at les products co., inc.
publisher Animo Repository
publishDate 2002
url https://animorepository.dlsu.edu.ph/etd_bachelors/12088
_version_ 1772834910638178304