A systems study on the plant operations department

Executive Summary. This study is concerned with the systems study on the plant operations department of Amwell Manufacturing Corporation. The problem being addressed is the high finished goods inventory value per month of PhP 86,385,900. It is a serious and urgent problem because it exceeds the allo...

Full description

Saved in:
Bibliographic Details
Main Authors: Ang, Sharon, Tang, Jenifer, Yao, Beverly
Format: text
Language:English
Published: Animo Repository 1999
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/12089
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-12734
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-127342021-09-17T02:05:49Z A systems study on the plant operations department Ang, Sharon Tang, Jenifer Yao, Beverly Executive Summary. This study is concerned with the systems study on the plant operations department of Amwell Manufacturing Corporation. The problem being addressed is the high finished goods inventory value per month of PhP 86,385,900. It is a serious and urgent problem because it exceeds the allotted PhP 50,000,000 by 72.77% on the average and the company wants it to be solved by the end of the year 1999. The system management and these writers believe that they have the significant time and resources to solve this problem. The problem has the following specifications: What: Fast moving products. Where: Finished goods inventory. When: Second half of 1997 How much: Average inventory cost is PhP 19,416,800 After an extensive analysis, it was determined that the problem was caused by the buffer stock and inaccurate forecast. These have negative effects to the system such that average money tied up in finished goods inventory exceeds the allotted by Php 36,385,900 per month and the average holding and storage cost of the excess finished goods inventory amounts to more than Php 869,900 per month. The solution proposed by the proponent is the reduction of buffer stock as well as the examination of the lead-time in production. This solution is estimated to reap a benefit amounting to more than Php 51,500,000. 1999-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/12089 Bachelor's Theses English Animo Repository
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
description Executive Summary. This study is concerned with the systems study on the plant operations department of Amwell Manufacturing Corporation. The problem being addressed is the high finished goods inventory value per month of PhP 86,385,900. It is a serious and urgent problem because it exceeds the allotted PhP 50,000,000 by 72.77% on the average and the company wants it to be solved by the end of the year 1999. The system management and these writers believe that they have the significant time and resources to solve this problem. The problem has the following specifications: What: Fast moving products. Where: Finished goods inventory. When: Second half of 1997 How much: Average inventory cost is PhP 19,416,800 After an extensive analysis, it was determined that the problem was caused by the buffer stock and inaccurate forecast. These have negative effects to the system such that average money tied up in finished goods inventory exceeds the allotted by Php 36,385,900 per month and the average holding and storage cost of the excess finished goods inventory amounts to more than Php 869,900 per month. The solution proposed by the proponent is the reduction of buffer stock as well as the examination of the lead-time in production. This solution is estimated to reap a benefit amounting to more than Php 51,500,000.
format text
author Ang, Sharon
Tang, Jenifer
Yao, Beverly
spellingShingle Ang, Sharon
Tang, Jenifer
Yao, Beverly
A systems study on the plant operations department
author_facet Ang, Sharon
Tang, Jenifer
Yao, Beverly
author_sort Ang, Sharon
title A systems study on the plant operations department
title_short A systems study on the plant operations department
title_full A systems study on the plant operations department
title_fullStr A systems study on the plant operations department
title_full_unstemmed A systems study on the plant operations department
title_sort systems study on the plant operations department
publisher Animo Repository
publishDate 1999
url https://animorepository.dlsu.edu.ph/etd_bachelors/12089
_version_ 1772834947139108864