A project study on the installation of a 3600-BBL dry process cement plant
Saved in:
Main Author: | Liwanag, Otello B. |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
1964
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_bachelors/838 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |
Similar Items
-
A project study on the feasibility of establishing a cement factory
by: Alcantara, Isabelito Y.
Published: (1965) -
A project study on a 3,600-kw steam turbine power plant
by: Guilateo, Edgardo N.
Published: (1962) -
A project study on the economic feasibility of setting up a cement factory
by: Torres, Manuel Cruz
Published: (1964) -
A 3600-kw steam turbine power plant
by: Limdico, Basilio L.
Published: (1962) -
A design of a 3,600 kw power plants
by: Murillo, George
Published: (1962)