A system study on the production system of chocolate factory

A plant of Chocolate Factory is unable to meet its order fill rate target of biscuit products and is incurring a loss P 20,106,250 or 80,425 cases for the year of 2018. The main problem occurs due to rejects because of the varying parameters set in the machines along the production line. The objecti...

Full description

Saved in:
Bibliographic Details
Main Authors: Galindo, Alezander Mikhail O., Nigam, Nisarg, Tan, Sean Bradley M.
Format: text
Language:English
Published: Animo Repository 2020
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/18670
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-19175
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-191752023-02-17T07:05:09Z A system study on the production system of chocolate factory Galindo, Alezander Mikhail O. Nigam, Nisarg Tan, Sean Bradley M. A plant of Chocolate Factory is unable to meet its order fill rate target of biscuit products and is incurring a loss P 20,106,250 or 80,425 cases for the year of 2018. The main problem occurs due to rejects because of the varying parameters set in the machines along the production line. The objective of this report is to document the current process and identify and address the root causes that lead to the problem in order to provide the host company a method to address said root causes of the system. The rejects occur in the baking and capping process of the biscuit production when the time spent in these machines are excess or lacking, causing overcooked or undercooked bases and underfilled, overfilled or misaligned cookie sandwiches. After a Taguchi Method of Experimentation, the optimized parameters and the time spent in the various machines were identified. A simulation on Arena software verified these results and demonstrated a 10% increase in production. This allows the system to completely meet the order fill rate target, recover the losses, and even gain an additional opportunity profit of P 4,463,750. 2020-01-06T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/18670 Bachelor's Theses English Animo Repository Chocolate industry—Production control Root cause analysis Operations Research, Systems Engineering and Industrial Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Chocolate industry—Production control
Root cause analysis
Operations Research, Systems Engineering and Industrial Engineering
spellingShingle Chocolate industry—Production control
Root cause analysis
Operations Research, Systems Engineering and Industrial Engineering
Galindo, Alezander Mikhail O.
Nigam, Nisarg
Tan, Sean Bradley M.
A system study on the production system of chocolate factory
description A plant of Chocolate Factory is unable to meet its order fill rate target of biscuit products and is incurring a loss P 20,106,250 or 80,425 cases for the year of 2018. The main problem occurs due to rejects because of the varying parameters set in the machines along the production line. The objective of this report is to document the current process and identify and address the root causes that lead to the problem in order to provide the host company a method to address said root causes of the system. The rejects occur in the baking and capping process of the biscuit production when the time spent in these machines are excess or lacking, causing overcooked or undercooked bases and underfilled, overfilled or misaligned cookie sandwiches. After a Taguchi Method of Experimentation, the optimized parameters and the time spent in the various machines were identified. A simulation on Arena software verified these results and demonstrated a 10% increase in production. This allows the system to completely meet the order fill rate target, recover the losses, and even gain an additional opportunity profit of P 4,463,750.
format text
author Galindo, Alezander Mikhail O.
Nigam, Nisarg
Tan, Sean Bradley M.
author_facet Galindo, Alezander Mikhail O.
Nigam, Nisarg
Tan, Sean Bradley M.
author_sort Galindo, Alezander Mikhail O.
title A system study on the production system of chocolate factory
title_short A system study on the production system of chocolate factory
title_full A system study on the production system of chocolate factory
title_fullStr A system study on the production system of chocolate factory
title_full_unstemmed A system study on the production system of chocolate factory
title_sort system study on the production system of chocolate factory
publisher Animo Repository
publishDate 2020
url https://animorepository.dlsu.edu.ph/etd_bachelors/18670
_version_ 1772835252083884032