A system study on the production department of Solid Ace Company

Solid Ace Aluminum and Glass Corporation is a firm engaged in the sale of different types of window, glass, mirror and aluminum products. Based on the study conducted by the proponent, it was found out that the company has been experiencing a 51.68% delays in terms of delivering the products to its...

Full description

Saved in:
Bibliographic Details
Main Author: Yu, Aldwin Ellison Sia
Format: text
Language:English
Published: Animo Repository 1997
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/1482
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-2482
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-24822021-06-05T07:28:13Z A system study on the production department of Solid Ace Company Yu, Aldwin Ellison Sia Solid Ace Aluminum and Glass Corporation is a firm engaged in the sale of different types of window, glass, mirror and aluminum products. Based on the study conducted by the proponent, it was found out that the company has been experiencing a 51.68% delays in terms of delivering the products to its customers and at the same time assembling them to their respective places. With this delays happening, they are suffer some losses in terms of customers goodwill and at the same time the lost sales which amounts to P 459,000.00. This happens because the company do experience delays that is why they cannot accommodate all people that goes to the store. The company's lack of workforce and at the same time lack of company vehicle leads to this delays. As found out using a simulation of the present systems as opposed to the proposed systems, it has been proven that the company do experience this delays because they lack company workers, or the so called assemblyman to the production area of the company in order to augment this problem, the company can add or hire additional manpower in order to minimize the job pilation and at the same time an additional worker can help minimize their delays. The addition of a van to the company can also help minimize the of the company in terms of delivery. The implementation of the Total Quality Management (TQM) to the company will also help the company in terms of motivating their employees, because as known that TQM gears toward a particular goal, and with that the all the company employees will have equal chances, wherein each and everyone of them can show of their own talent and management abilities. 1997-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/1482 Bachelor's Theses English Animo Repository System analysis Production engineering Just-in-time systems Aluminum industry and trade
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic System analysis
Production engineering
Just-in-time systems
Aluminum industry and trade
spellingShingle System analysis
Production engineering
Just-in-time systems
Aluminum industry and trade
Yu, Aldwin Ellison Sia
A system study on the production department of Solid Ace Company
description Solid Ace Aluminum and Glass Corporation is a firm engaged in the sale of different types of window, glass, mirror and aluminum products. Based on the study conducted by the proponent, it was found out that the company has been experiencing a 51.68% delays in terms of delivering the products to its customers and at the same time assembling them to their respective places. With this delays happening, they are suffer some losses in terms of customers goodwill and at the same time the lost sales which amounts to P 459,000.00. This happens because the company do experience delays that is why they cannot accommodate all people that goes to the store. The company's lack of workforce and at the same time lack of company vehicle leads to this delays. As found out using a simulation of the present systems as opposed to the proposed systems, it has been proven that the company do experience this delays because they lack company workers, or the so called assemblyman to the production area of the company in order to augment this problem, the company can add or hire additional manpower in order to minimize the job pilation and at the same time an additional worker can help minimize their delays. The addition of a van to the company can also help minimize the of the company in terms of delivery. The implementation of the Total Quality Management (TQM) to the company will also help the company in terms of motivating their employees, because as known that TQM gears toward a particular goal, and with that the all the company employees will have equal chances, wherein each and everyone of them can show of their own talent and management abilities.
format text
author Yu, Aldwin Ellison Sia
author_facet Yu, Aldwin Ellison Sia
author_sort Yu, Aldwin Ellison Sia
title A system study on the production department of Solid Ace Company
title_short A system study on the production department of Solid Ace Company
title_full A system study on the production department of Solid Ace Company
title_fullStr A system study on the production department of Solid Ace Company
title_full_unstemmed A system study on the production department of Solid Ace Company
title_sort system study on the production department of solid ace company
publisher Animo Repository
publishDate 1997
url https://animorepository.dlsu.edu.ph/etd_bachelors/1482
_version_ 1772834499363602432