A system study on the roofing profiles of Philmetal Products Incorporated

The system study is about inventory management system of the of PhilMetal Carmona plant. The primary focus of the inventory system is the three roofing profiles of the company namely the Spandek, Econocorr, and the Steeltile. After a thorough study of the Carmona plant's present system, it was...

Full description

Saved in:
Bibliographic Details
Main Author: Agravante, Oliver
Format: text
Language:English
Published: Animo Repository 1999
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/1632
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-2632
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-26322021-05-30T07:47:05Z A system study on the roofing profiles of Philmetal Products Incorporated Agravante, Oliver The system study is about inventory management system of the of PhilMetal Carmona plant. The primary focus of the inventory system is the three roofing profiles of the company namely the Spandek, Econocorr, and the Steeltile. After a thorough study of the Carmona plant's present system, it was found out that the Carmona plant had an opportunity cost of P35,576,786,66 in 1997 due to the non-availability of raw materials for production. Further analysis of the problem uncovered the cause of the problem. The Inventory Planning and Control (IPC) department of the plant did not have a formal inventory scheduling process. The IPC department only orders raw materials when the job orders arrive. The IPC is not able to check its stock position to determine whether there are enough raw materials for production. The study proposed three inventory scheduling systems and evaluated the alternatives using the Kepner-Tregoe decision analysis. Cost efficiency, storage considerations, and ease of implementation were used as the criteria for evaluating the different alternative solutions. The Materials Requirement Plan was chosen as the best alternative. With the proposed system the company would be able to realize an additional sales of P 33, 923,432.66. Implementation of the proposed system will require 13 weeks to accustom the plant with the new system. 1999-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/1632 Bachelor's Theses English Animo Repository
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
description The system study is about inventory management system of the of PhilMetal Carmona plant. The primary focus of the inventory system is the three roofing profiles of the company namely the Spandek, Econocorr, and the Steeltile. After a thorough study of the Carmona plant's present system, it was found out that the Carmona plant had an opportunity cost of P35,576,786,66 in 1997 due to the non-availability of raw materials for production. Further analysis of the problem uncovered the cause of the problem. The Inventory Planning and Control (IPC) department of the plant did not have a formal inventory scheduling process. The IPC department only orders raw materials when the job orders arrive. The IPC is not able to check its stock position to determine whether there are enough raw materials for production. The study proposed three inventory scheduling systems and evaluated the alternatives using the Kepner-Tregoe decision analysis. Cost efficiency, storage considerations, and ease of implementation were used as the criteria for evaluating the different alternative solutions. The Materials Requirement Plan was chosen as the best alternative. With the proposed system the company would be able to realize an additional sales of P 33, 923,432.66. Implementation of the proposed system will require 13 weeks to accustom the plant with the new system.
format text
author Agravante, Oliver
spellingShingle Agravante, Oliver
A system study on the roofing profiles of Philmetal Products Incorporated
author_facet Agravante, Oliver
author_sort Agravante, Oliver
title A system study on the roofing profiles of Philmetal Products Incorporated
title_short A system study on the roofing profiles of Philmetal Products Incorporated
title_full A system study on the roofing profiles of Philmetal Products Incorporated
title_fullStr A system study on the roofing profiles of Philmetal Products Incorporated
title_full_unstemmed A system study on the roofing profiles of Philmetal Products Incorporated
title_sort system study on the roofing profiles of philmetal products incorporated
publisher Animo Repository
publishDate 1999
url https://animorepository.dlsu.edu.ph/etd_bachelors/1632
_version_ 1772834599169163264