A system study on the polyethylene production department of Techno Plas Manufacturing

TechnoPlas Manufacturing Company is a registered company producing polymeric package products for wet and dry markets in the Southern parts of Luzon. The study focuses in the production system of the polyethylene products. The problem of the study is the high reject rate. It was found that 3.80% of...

Full description

Saved in:
Bibliographic Details
Main Author: Go, Michael
Format: text
Language:English
Published: Animo Repository 2001
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/1801
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-2801
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-28012021-05-27T01:57:35Z A system study on the polyethylene production department of Techno Plas Manufacturing Go, Michael TechnoPlas Manufacturing Company is a registered company producing polymeric package products for wet and dry markets in the Southern parts of Luzon. The study focuses in the production system of the polyethylene products. The problem of the study is the high reject rate. It was found that 3.80% of the total output in the polyethylene department for the year 2000 exceeded the allowable reject rate of 1%. This reject rate amounts to an opportunity loss of P870,954.00. The main causes of high reject rate are short shots and color mixes in extrusion area which comprise of 85% of the total rejects. Further investigation showed the true subcauses. The carelessness of the extrusion operators accounts to 24.4% of the short shots incurred. The use of recycled resin accounts to 60% of the total short shots. The improper settings of extrusion machine parameter accounts to 24.4% of the total short shots. The lose thread of dial pins, malfunctioning of the hydraulic pumps, and uncleaned machine parts accounts for 60% of the total rejects. To address the reject rate, the study proposes to implement the following courses of action: a. The management should impose a penalty for the commission of negligence to the offending operators. b. The extrusion operators should adjust the melting time parameter of the extrusion machine when processing recycled resins. c. The extrusion operators should replace dial pins for all the machines once every two years. d. The system should adopt preventive maintenance by regular checkup and cleaning of vital machine parts especially the dials of the extrusion machines. 3. The plant manager should conduct design of experiments for setting of standard for different product specifications. The solutions are expected to result to the following benefits. The system will gain a net benefit amounting to P 2,590,352 for a period of 5 years. The system will attain qualitative benefits of improved process capability, improved information system, and maintenance system. This implementation of the recommended solution is proposed to start on September for the preparation and on October for the final implementation. 2001-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/1801 Bachelor's Theses English Animo Repository
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
description TechnoPlas Manufacturing Company is a registered company producing polymeric package products for wet and dry markets in the Southern parts of Luzon. The study focuses in the production system of the polyethylene products. The problem of the study is the high reject rate. It was found that 3.80% of the total output in the polyethylene department for the year 2000 exceeded the allowable reject rate of 1%. This reject rate amounts to an opportunity loss of P870,954.00. The main causes of high reject rate are short shots and color mixes in extrusion area which comprise of 85% of the total rejects. Further investigation showed the true subcauses. The carelessness of the extrusion operators accounts to 24.4% of the short shots incurred. The use of recycled resin accounts to 60% of the total short shots. The improper settings of extrusion machine parameter accounts to 24.4% of the total short shots. The lose thread of dial pins, malfunctioning of the hydraulic pumps, and uncleaned machine parts accounts for 60% of the total rejects. To address the reject rate, the study proposes to implement the following courses of action: a. The management should impose a penalty for the commission of negligence to the offending operators. b. The extrusion operators should adjust the melting time parameter of the extrusion machine when processing recycled resins. c. The extrusion operators should replace dial pins for all the machines once every two years. d. The system should adopt preventive maintenance by regular checkup and cleaning of vital machine parts especially the dials of the extrusion machines. 3. The plant manager should conduct design of experiments for setting of standard for different product specifications. The solutions are expected to result to the following benefits. The system will gain a net benefit amounting to P 2,590,352 for a period of 5 years. The system will attain qualitative benefits of improved process capability, improved information system, and maintenance system. This implementation of the recommended solution is proposed to start on September for the preparation and on October for the final implementation.
format text
author Go, Michael
spellingShingle Go, Michael
A system study on the polyethylene production department of Techno Plas Manufacturing
author_facet Go, Michael
author_sort Go, Michael
title A system study on the polyethylene production department of Techno Plas Manufacturing
title_short A system study on the polyethylene production department of Techno Plas Manufacturing
title_full A system study on the polyethylene production department of Techno Plas Manufacturing
title_fullStr A system study on the polyethylene production department of Techno Plas Manufacturing
title_full_unstemmed A system study on the polyethylene production department of Techno Plas Manufacturing
title_sort system study on the polyethylene production department of techno plas manufacturing
publisher Animo Repository
publishDate 2001
url https://animorepository.dlsu.edu.ph/etd_bachelors/1801
_version_ 1772834637513490432