A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.

Remerco Garments Manufacturing, Inc. is a company that manufactures excellent quality children wears. The firm caters only to foreign buyers as far as the job orders are concern. Being in the garment business for almost 20 years already does not spare the company from problems occuring during produc...

Full description

Saved in:
Bibliographic Details
Main Author: Bonoan, Benedict R.
Format: text
Language:English
Published: Animo Repository 1991
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/1898
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-2898
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-28982021-05-24T05:28:59Z A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc. Bonoan, Benedict R. Remerco Garments Manufacturing, Inc. is a company that manufactures excellent quality children wears. The firm caters only to foreign buyers as far as the job orders are concern. Being in the garment business for almost 20 years already does not spare the company from problems occuring during production.From occular inspections and observations of the firm's present system, it was disclosed that delays in the production department of the company had created disadvantageous effects. These effects range from late shipping of orders which could lead to cancellation of orders and rush in production which could naturally lead to overtime. All of which would definitely cost the company a lot of money.After analyzing the present system of the company, it was found out that the true causes of the delay in production is the poor and unrealistic scheduling and monitoring system of the company.In the proposed system, a time study was constructed that would allow the company to make a proper and realistic scheduling in order to meet the shipment dates of the job orders. Also, monitoring tools were provided in order to perceive In-House Processes presently undergoing stages of work in the working area. 1991-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/1898 Bachelor's Theses English Animo Repository
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
description Remerco Garments Manufacturing, Inc. is a company that manufactures excellent quality children wears. The firm caters only to foreign buyers as far as the job orders are concern. Being in the garment business for almost 20 years already does not spare the company from problems occuring during production.From occular inspections and observations of the firm's present system, it was disclosed that delays in the production department of the company had created disadvantageous effects. These effects range from late shipping of orders which could lead to cancellation of orders and rush in production which could naturally lead to overtime. All of which would definitely cost the company a lot of money.After analyzing the present system of the company, it was found out that the true causes of the delay in production is the poor and unrealistic scheduling and monitoring system of the company.In the proposed system, a time study was constructed that would allow the company to make a proper and realistic scheduling in order to meet the shipment dates of the job orders. Also, monitoring tools were provided in order to perceive In-House Processes presently undergoing stages of work in the working area.
format text
author Bonoan, Benedict R.
spellingShingle Bonoan, Benedict R.
A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.
author_facet Bonoan, Benedict R.
author_sort Bonoan, Benedict R.
title A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.
title_short A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.
title_full A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.
title_fullStr A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.
title_full_unstemmed A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.
title_sort systems study on the scheduling and monitoring of remerco garments manufacturing, inc.
publisher Animo Repository
publishDate 1991
url https://animorepository.dlsu.edu.ph/etd_bachelors/1898
_version_ 1772834500564221952