A system study on Felicidad Gaita Enterprise

Felicidad Gaita Enterprise (FGE) is a sub-contractor for garments that exports basic and fashion pants as well as shorts to quota countries such as the United States. The company allows a maximum standard of 8% per month of the total volume produced (verified using the data from January to December...

Full description

Saved in:
Bibliographic Details
Main Authors: Capco, Glenda C., Profeta, Kristine H.
Format: text
Language:English
Published: Animo Repository 1997
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/4100
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-4788
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-47882021-01-25T05:43:52Z A system study on Felicidad Gaita Enterprise Capco, Glenda C. Profeta, Kristine H. Felicidad Gaita Enterprise (FGE) is a sub-contractor for garments that exports basic and fashion pants as well as shorts to quota countries such as the United States. The company allows a maximum standard of 8% per month of the total volume produced (verified using the data from January to December 1994) for rework, however, they are producing on the average 11% per month which is 3% per month above the maximum for a total cost of P 129,549 for the year 1995. By making the system study in the production area, it was established that the real cause of reworking jeans is due to the limited capacity of the assembly section thus, assigning excess units to the front and back sections in the factory. The proposed solution was to add new machines to the assembly to accommodate arriving units of jeans. Through Monte Carlo simulation, eleven double needle sewing machines will be added to the assembly section. This solution will reduce rework to only 5.23 % per month at the same time minimizing idle time to only 8.27 % in the assembly. This proposed system will cost the company P 385,000 for acquiring the machines, training costs of P 6600 per week, additional labor cost of P 49,764 and factory overhead of P 729.30 per month. On the other hand, since the reworking of jeans will reduce to only 5.23%, the company will be able to save P 68,880 per month. After all costs are deducted, FGE will be gaining P 18,387.12 per month or P 220,645.44 per year. In the same way, there will be also an increase in sales of P 36,434.50 per year. The return on investment will be acquired within 2 years and 2 months. Implementation of this proposed solution will be effective in three months, this includes installing of new machines, hiring, training and orienting or sewers, dry-run and evaluation of the propose system. 1997-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/4100 Bachelor's Theses English Animo Repository Industrial efficiency Industrial engineering Industrial Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Industrial efficiency
Industrial engineering
Industrial Engineering
spellingShingle Industrial efficiency
Industrial engineering
Industrial Engineering
Capco, Glenda C.
Profeta, Kristine H.
A system study on Felicidad Gaita Enterprise
description Felicidad Gaita Enterprise (FGE) is a sub-contractor for garments that exports basic and fashion pants as well as shorts to quota countries such as the United States. The company allows a maximum standard of 8% per month of the total volume produced (verified using the data from January to December 1994) for rework, however, they are producing on the average 11% per month which is 3% per month above the maximum for a total cost of P 129,549 for the year 1995. By making the system study in the production area, it was established that the real cause of reworking jeans is due to the limited capacity of the assembly section thus, assigning excess units to the front and back sections in the factory. The proposed solution was to add new machines to the assembly to accommodate arriving units of jeans. Through Monte Carlo simulation, eleven double needle sewing machines will be added to the assembly section. This solution will reduce rework to only 5.23 % per month at the same time minimizing idle time to only 8.27 % in the assembly. This proposed system will cost the company P 385,000 for acquiring the machines, training costs of P 6600 per week, additional labor cost of P 49,764 and factory overhead of P 729.30 per month. On the other hand, since the reworking of jeans will reduce to only 5.23%, the company will be able to save P 68,880 per month. After all costs are deducted, FGE will be gaining P 18,387.12 per month or P 220,645.44 per year. In the same way, there will be also an increase in sales of P 36,434.50 per year. The return on investment will be acquired within 2 years and 2 months. Implementation of this proposed solution will be effective in three months, this includes installing of new machines, hiring, training and orienting or sewers, dry-run and evaluation of the propose system.
format text
author Capco, Glenda C.
Profeta, Kristine H.
author_facet Capco, Glenda C.
Profeta, Kristine H.
author_sort Capco, Glenda C.
title A system study on Felicidad Gaita Enterprise
title_short A system study on Felicidad Gaita Enterprise
title_full A system study on Felicidad Gaita Enterprise
title_fullStr A system study on Felicidad Gaita Enterprise
title_full_unstemmed A system study on Felicidad Gaita Enterprise
title_sort system study on felicidad gaita enterprise
publisher Animo Repository
publishDate 1997
url https://animorepository.dlsu.edu.ph/etd_bachelors/4100
_version_ 1772834649167364096