Combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference

Container-related transportation activities have grown remarkably over the last 10 years and the trend does not show any signs of slowing down. Many studies have been made on how to improve container terminal operations and most of these studies have decomposed the terminal operations into sub-probl...

Full description

Saved in:
Bibliographic Details
Main Authors: Apacible, Justine Michelle B., Baylas, Daryl F.
Format: text
Language:English
Published: Animo Repository 2011
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/5269
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-5845
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-58452021-04-22T01:48:33Z Combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference Apacible, Justine Michelle B. Baylas, Daryl F. Container-related transportation activities have grown remarkably over the last 10 years and the trend does not show any signs of slowing down. Many studies have been made on how to improve container terminal operations and most of these studies have decomposed the terminal operations into sub-problems for the convenience of modeling and solution. Scheduling vehicles and equipment frequently arises in logistics system and these problems have been extensively studied under different settings. Effective and efficient scheduling of yard crane operations is essential to guarantee a smooth and fast container flow in a container terminal thus, this research is dedicated to the scheduling of yard trucks and yard cranes to perform a given set of loading jobs while considering inter-crane interference and prioritization placement in the vessel. The model is formulated as a mixed-integer programming model and solved using CPLEX in General Algebraic Modeling System (GAMS). Multiple runs were conducted using GAMS to determine the interaction between parameters and its effects on the response of the model. A sensitivity analysis was also conducted to determine the sensitivity of the model to changes in the value of parameters and to changes the sensitivity of the model to changes in the value of parameters and to changes in the model's structure. Results obtained were given conclusions, and recommendations for further studies were stated for future improvement of the formulated model. 2011-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/5269 Bachelor's Theses English Animo Repository Unitized cargo systems Scheduling Industrial Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Unitized cargo systems
Scheduling
Industrial Engineering
spellingShingle Unitized cargo systems
Scheduling
Industrial Engineering
Apacible, Justine Michelle B.
Baylas, Daryl F.
Combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference
description Container-related transportation activities have grown remarkably over the last 10 years and the trend does not show any signs of slowing down. Many studies have been made on how to improve container terminal operations and most of these studies have decomposed the terminal operations into sub-problems for the convenience of modeling and solution. Scheduling vehicles and equipment frequently arises in logistics system and these problems have been extensively studied under different settings. Effective and efficient scheduling of yard crane operations is essential to guarantee a smooth and fast container flow in a container terminal thus, this research is dedicated to the scheduling of yard trucks and yard cranes to perform a given set of loading jobs while considering inter-crane interference and prioritization placement in the vessel. The model is formulated as a mixed-integer programming model and solved using CPLEX in General Algebraic Modeling System (GAMS). Multiple runs were conducted using GAMS to determine the interaction between parameters and its effects on the response of the model. A sensitivity analysis was also conducted to determine the sensitivity of the model to changes in the value of parameters and to changes the sensitivity of the model to changes in the value of parameters and to changes in the model's structure. Results obtained were given conclusions, and recommendations for further studies were stated for future improvement of the formulated model.
format text
author Apacible, Justine Michelle B.
Baylas, Daryl F.
author_facet Apacible, Justine Michelle B.
Baylas, Daryl F.
author_sort Apacible, Justine Michelle B.
title Combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference
title_short Combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference
title_full Combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference
title_fullStr Combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference
title_full_unstemmed Combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference
title_sort combined yard crane deployment scheduling and yard truck scheduling for loading outbound containers with inter-crane interference
publisher Animo Repository
publishDate 2011
url https://animorepository.dlsu.edu.ph/etd_bachelors/5269
_version_ 1772834614585327616