A multi-period facility location-allocation decision on collection and reprocessing of used products
Over the years, simply dumping the End-of-Life products in landfills is no longer a viable solution. A reverse supply chain is used to limit this growing problem. Collection and reprocessing are the two main activities in this reverse supply chain. However to do this, one should address the importan...
Saved in:
Main Authors: | Ordonez, David Jonathan L., Pua, Florence G. |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
2012
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_bachelors/5552 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |
Similar Items
-
A multi-period facility location-allocation decision on collection and reprocessing of used products
by: Ordonez, David Jonathan L., et al.
Published: (2012) -
A study on the feasibility of a capacity expansion of a reprocessed gypsum plant
by: Gozo, Augusto A.
Published: (1979) -
Optimal lot sizing model with reprocessing of defective output
by: Estanislao, Eppie V.
Published: (1993) -
Systematic allocation of cost savings among energy systems in an eco-industrial park
by: Andiappan, Viknesh, et al.
Published: (2015) -
An optimization-based cooperative game approach for allocation of costs and benefits in interplant process integration
by: Tan, Raymond Girard R., et al.
Published: (2015)