This study is aimed at developing a computer based materials monitoring system for the construction of reinforced concrete building. Survey and interviews of key personnel were conducted to determine the principles, practices as well as the problems encountered in this area so as to provide informat...

Full description

Saved in:
Bibliographic Details
Main Authors: Mauricio, Ramon C., Ongpeng, Al Constantino C., Wee, Brian C.
Format: text
Language:English
Published: Animo Repository 1995
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/7033
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-7677
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-76772021-07-21T05:25:33Z Computer-based materials monitoring system for reinforced concrete building Mauricio, Ramon C. Ongpeng, Al Constantino C. Wee, Brian C. This study is aimed at developing a computer based materials monitoring system for the construction of reinforced concrete building. Survey and interviews of key personnel were conducted to determine the principles, practices as well as the problems encountered in this area so as to provide information for system design consideration. Based on the survey and interviews, it was learned that the problems encountered by those firms consulted are: slow collection and processing of data and unmonitored losses due to pilferage. Furthermore, they have stressed that the system should have the following characteristics.1.) It must be able to monitor the levels of inventory at any given time2.) It must be able to provide a comparison between estimated and actual details3.) It must be able to project the materials requirement for any given interval4.) It must be able to adjust to changes in schedule5.) It must be able to provide timely and accurate information. As for the problem with the processing of data, a computer program was developed. This program was designed considering the requirements for materials monitoring set forth by those firms consulted. Processing of data with a computer reduces the processing time 17 times. The solution to the two other problems relies on policies that management may impose to shorten the duration in data collection and to reduce the incidence of pilferage. It is recommended to conduct a study on the viability and cost effectiveness of this proposed system. 1995-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/7033 Bachelor's Theses English Animo Repository Computer systems Material accountability Buildings, Reinforced concrete--Costs Cost control Business--Data processing
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Computer systems
Material accountability
Buildings, Reinforced concrete--Costs
Cost control
Business--Data processing
spellingShingle Computer systems
Material accountability
Buildings, Reinforced concrete--Costs
Cost control
Business--Data processing
Mauricio, Ramon C.
Ongpeng, Al Constantino C.
Wee, Brian C.
Computer-based materials monitoring system for reinforced concrete building
description This study is aimed at developing a computer based materials monitoring system for the construction of reinforced concrete building. Survey and interviews of key personnel were conducted to determine the principles, practices as well as the problems encountered in this area so as to provide information for system design consideration. Based on the survey and interviews, it was learned that the problems encountered by those firms consulted are: slow collection and processing of data and unmonitored losses due to pilferage. Furthermore, they have stressed that the system should have the following characteristics.1.) It must be able to monitor the levels of inventory at any given time2.) It must be able to provide a comparison between estimated and actual details3.) It must be able to project the materials requirement for any given interval4.) It must be able to adjust to changes in schedule5.) It must be able to provide timely and accurate information. As for the problem with the processing of data, a computer program was developed. This program was designed considering the requirements for materials monitoring set forth by those firms consulted. Processing of data with a computer reduces the processing time 17 times. The solution to the two other problems relies on policies that management may impose to shorten the duration in data collection and to reduce the incidence of pilferage. It is recommended to conduct a study on the viability and cost effectiveness of this proposed system.
format text
author Mauricio, Ramon C.
Ongpeng, Al Constantino C.
Wee, Brian C.
author_facet Mauricio, Ramon C.
Ongpeng, Al Constantino C.
Wee, Brian C.
author_sort Mauricio, Ramon C.
title Computer-based materials monitoring system for reinforced concrete building
title_short Computer-based materials monitoring system for reinforced concrete building
title_full Computer-based materials monitoring system for reinforced concrete building
title_fullStr Computer-based materials monitoring system for reinforced concrete building
title_full_unstemmed Computer-based materials monitoring system for reinforced concrete building
title_sort computer-based materials monitoring system for reinforced concrete building
publisher Animo Repository
publishDate 1995
url https://animorepository.dlsu.edu.ph/etd_bachelors/7033
_version_ 1707059037425631232