Monitoring and control of owner-furnished material
To address material problems and their associated costs, the owner and the contractor must pursue and implement innovative quality-monitoring strategies. This paper presents the need for the planning, scheduling, and monitoring of construction materials to ensure the continuous availability and supp...
Saved in:
Main Authors: | Dimapindan, Lea M., Marinas, Liza P., Nuguit, Michelle M. |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
1994
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_bachelors/7109 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |
Similar Items
-
Computer-based materials monitoring system for reinforced concrete building
by: Mauricio, Ramon C., et al.
Published: (1995) -
Ferrocement: An alternative roofing material for low-cost housing
by: Co, Oliver G.C., et al.
Published: (1994) -
CONTRACT ARRANGEMENTS FOR PILING WORKS
by: LEE MUI CHENG
Published: (2018) -
CONSTRUCTION MANAGEMENT IN CONTEMPORARY SINGAPORE
by: TOH YUN TAO ROYSTON
Published: (2009) -
A proposed cost control system for residential construction in Metro Manila
by: Cruzado, Eduardo
Published: (1992)