A system study on the production department of fashion gift and accessories corporation

The Systems Study on the Production Department of Fashion Gift and Accessories (FGAC) focused on the documentation and analysis of the manufacturing of handbags from cutting, beading, attaching, beading, sewing, and packing. FGAC's strength (S) is the capability, dexterity, and flexibility to m...

Full description

Saved in:
Bibliographic Details
Main Authors: Arlantico, Allan, Igama, Jose Mari, Tuazon, Rex
Format: text
Language:English
Published: Animo Repository 2006
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/8153
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-8798
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-87982021-08-09T03:22:01Z A system study on the production department of fashion gift and accessories corporation Arlantico, Allan Igama, Jose Mari Tuazon, Rex The Systems Study on the Production Department of Fashion Gift and Accessories (FGAC) focused on the documentation and analysis of the manufacturing of handbags from cutting, beading, attaching, beading, sewing, and packing. FGAC's strength (S) is the capability, dexterity, and flexibility to manufacture an average of 35 bag styles per year. Its weaknesses (W) include: (1) actual production man-hours deviates from plan man-hours by 66.06%, (2) compliance to their delivery schedule of 85.71%, and (3) the system achieves only 98.46% quality conformance. Some opportunities (O) and threats (T) also surface. After prioritization of the WOT vis-a -vis their seriousness, urgency, resources and growth, evaluation of the weaknesses, deviation of actual man-hours from planned man-hours was found to be FGAC's worst problem. There were six (6) causes identified, specifically: (1) lack of implementation of the Production Planning and Control (PPC) System of FGAC, (2) lack of time standards of handbags, (3) poor workers' performance, (4) no time standards gathering during lean season, (5) inaccurate time standards gathered, and (6) use of gut feel in scheduling the jobs. Solutions for the major causes include improvements in the recruitment process, implementation of dummy run during lean months to gather time standards, training programs for regular and new workers, generating a database of time standards for common elements, earliest due date heuristic in scheduling jobs. In conclusion, the study provided viable solutions in minimizing the actual production man-hours and planned man-hours. The study shows that in order to achieve zero (0) or less deviation between actual and planned production schedule, FGAC should include transportation and delay activities to better forecast the manpower requirement, and train workers to eliminate reworks. The solution decreased the overtime which will amount a saving of Php41,687.50 for year 2005. The benefit is realized as a positive Net Present Value (NPV) of Php136,497.1 for a period of 5 years. 2006-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/8153 Bachelor's Theses English Animo Repository Leather industry and trade--Philippines Dress accessories--Philippines Production management
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Leather industry and trade--Philippines
Dress accessories--Philippines
Production management
spellingShingle Leather industry and trade--Philippines
Dress accessories--Philippines
Production management
Arlantico, Allan
Igama, Jose Mari
Tuazon, Rex
A system study on the production department of fashion gift and accessories corporation
description The Systems Study on the Production Department of Fashion Gift and Accessories (FGAC) focused on the documentation and analysis of the manufacturing of handbags from cutting, beading, attaching, beading, sewing, and packing. FGAC's strength (S) is the capability, dexterity, and flexibility to manufacture an average of 35 bag styles per year. Its weaknesses (W) include: (1) actual production man-hours deviates from plan man-hours by 66.06%, (2) compliance to their delivery schedule of 85.71%, and (3) the system achieves only 98.46% quality conformance. Some opportunities (O) and threats (T) also surface. After prioritization of the WOT vis-a -vis their seriousness, urgency, resources and growth, evaluation of the weaknesses, deviation of actual man-hours from planned man-hours was found to be FGAC's worst problem. There were six (6) causes identified, specifically: (1) lack of implementation of the Production Planning and Control (PPC) System of FGAC, (2) lack of time standards of handbags, (3) poor workers' performance, (4) no time standards gathering during lean season, (5) inaccurate time standards gathered, and (6) use of gut feel in scheduling the jobs. Solutions for the major causes include improvements in the recruitment process, implementation of dummy run during lean months to gather time standards, training programs for regular and new workers, generating a database of time standards for common elements, earliest due date heuristic in scheduling jobs. In conclusion, the study provided viable solutions in minimizing the actual production man-hours and planned man-hours. The study shows that in order to achieve zero (0) or less deviation between actual and planned production schedule, FGAC should include transportation and delay activities to better forecast the manpower requirement, and train workers to eliminate reworks. The solution decreased the overtime which will amount a saving of Php41,687.50 for year 2005. The benefit is realized as a positive Net Present Value (NPV) of Php136,497.1 for a period of 5 years.
format text
author Arlantico, Allan
Igama, Jose Mari
Tuazon, Rex
author_facet Arlantico, Allan
Igama, Jose Mari
Tuazon, Rex
author_sort Arlantico, Allan
title A system study on the production department of fashion gift and accessories corporation
title_short A system study on the production department of fashion gift and accessories corporation
title_full A system study on the production department of fashion gift and accessories corporation
title_fullStr A system study on the production department of fashion gift and accessories corporation
title_full_unstemmed A system study on the production department of fashion gift and accessories corporation
title_sort system study on the production department of fashion gift and accessories corporation
publisher Animo Repository
publishDate 2006
url https://animorepository.dlsu.edu.ph/etd_bachelors/8153
_version_ 1772834762692493312