A systems study for the production department of Makki Fashion Shoes

The problem of delay in the delivery of shoes is a very common problem in the shoe manufacturing industry. Makki Fashion Shoes (MFS) is not an exception to this. From the study of the production system of the company, it was discovered that for the period of January to June 1997, 52.4% of the total...

Full description

Saved in:
Bibliographic Details
Main Authors: Chuidian, Czarena Louise, Mendiola, Genevieve Anne, Santos, Christy Rose
Format: text
Language:English
Published: Animo Repository 1998
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/8259
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-8904
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-89042021-08-13T02:41:36Z A systems study for the production department of Makki Fashion Shoes Chuidian, Czarena Louise Mendiola, Genevieve Anne Santos, Christy Rose The problem of delay in the delivery of shoes is a very common problem in the shoe manufacturing industry. Makki Fashion Shoes (MFS) is not an exception to this. From the study of the production system of the company, it was discovered that for the period of January to June 1997, 52.4% of the total shoes that should have been delivered was delayed. The cost that was incurred due to this was Php. 18,313. From this problem, an analysis of the present system was conducted. Several causes were identified that contributed to the company's main problem. Among these, the three main problems were the undetermined capacity of the plant, which caused management to accept orders beyond what they can manufacture, poor working conditions, and the late delivery of materials from the suppliers. Utilizing the Kepner-Tregoe Decision Analysis and the Optimized Production Technology (OPT) Approach, a new system was developed for MFS. This system proposed an OPT schedule that includes the injection of a padlock machine in the production system. The problem on the working condition was also addressed by the installation of a new set of jalousie windows in the shoe lasting section. The proposed system was justified further through the analysis of the costs that would be incurred and benefits that would be gained by the company. An increase in sales equivalent to Php. 97,416 was realized from this system. In addition to this, the net present value at the end of the economic life of the project was computed to be equivalent to Php. 120,180.10427767 1998-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/8259 Bachelor's Theses English Animo Repository Manufacturing industry Shoemakers Shoe industry Management--Employee participation Industrial management
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Manufacturing industry
Shoemakers
Shoe industry
Management--Employee participation
Industrial management
spellingShingle Manufacturing industry
Shoemakers
Shoe industry
Management--Employee participation
Industrial management
Chuidian, Czarena Louise
Mendiola, Genevieve Anne
Santos, Christy Rose
A systems study for the production department of Makki Fashion Shoes
description The problem of delay in the delivery of shoes is a very common problem in the shoe manufacturing industry. Makki Fashion Shoes (MFS) is not an exception to this. From the study of the production system of the company, it was discovered that for the period of January to June 1997, 52.4% of the total shoes that should have been delivered was delayed. The cost that was incurred due to this was Php. 18,313. From this problem, an analysis of the present system was conducted. Several causes were identified that contributed to the company's main problem. Among these, the three main problems were the undetermined capacity of the plant, which caused management to accept orders beyond what they can manufacture, poor working conditions, and the late delivery of materials from the suppliers. Utilizing the Kepner-Tregoe Decision Analysis and the Optimized Production Technology (OPT) Approach, a new system was developed for MFS. This system proposed an OPT schedule that includes the injection of a padlock machine in the production system. The problem on the working condition was also addressed by the installation of a new set of jalousie windows in the shoe lasting section. The proposed system was justified further through the analysis of the costs that would be incurred and benefits that would be gained by the company. An increase in sales equivalent to Php. 97,416 was realized from this system. In addition to this, the net present value at the end of the economic life of the project was computed to be equivalent to Php. 120,180.10427767
format text
author Chuidian, Czarena Louise
Mendiola, Genevieve Anne
Santos, Christy Rose
author_facet Chuidian, Czarena Louise
Mendiola, Genevieve Anne
Santos, Christy Rose
author_sort Chuidian, Czarena Louise
title A systems study for the production department of Makki Fashion Shoes
title_short A systems study for the production department of Makki Fashion Shoes
title_full A systems study for the production department of Makki Fashion Shoes
title_fullStr A systems study for the production department of Makki Fashion Shoes
title_full_unstemmed A systems study for the production department of Makki Fashion Shoes
title_sort systems study for the production department of makki fashion shoes
publisher Animo Repository
publishDate 1998
url https://animorepository.dlsu.edu.ph/etd_bachelors/8259
_version_ 1772834744248041472