A systems study on the production department of J.F. Rubber Philippines, Inc.

J.F Rubber Philippines is a company that manufactures rubber parts for the automotive and electronics industries. It is located at the People's Technology Complex - Special Economic Zone in Carmona, Cavite. The system study is concerned with the company's production department, more specif...

Full description

Saved in:
Bibliographic Details
Main Authors: Ang, Tim Lexter, Meneses, Tomas David, Yuquico, Ryan
Format: text
Language:English
Published: Animo Repository 2006
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/8691
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-9336
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-93362021-08-06T05:07:24Z A systems study on the production department of J.F. Rubber Philippines, Inc. Ang, Tim Lexter Meneses, Tomas David Yuquico, Ryan J.F Rubber Philippines is a company that manufactures rubber parts for the automotive and electronics industries. It is located at the People's Technology Complex - Special Economic Zone in Carmona, Cavite. The system study is concerned with the company's production department, more specifically on the products that undergo compression curing. The products identified to have the highest output are the grommets, o-rings, and packings which are all automotive parts used as sealants and coverings for the car or motorcycle's electronic components. The system exceeded its .25% target reject rate for compression by 2.36% during the year 2005. The company has therefore incurred Php9,653,914 in costs of rejects for the whole year. This is found to be the system's main problem. The main types of rejects that affect the products are Air Checks, Flow Cracks, Short Shots, Overtrim, Release Marks, Embedded Flashes and Deformation. After the evaluation of the probable causes, the identified causes for these rejects are Low Mould Temperature, Low Pressure, Improper Handling of Product While Still Hot, Improper Releasing Technique of Operator, Application of Too Much Silicone, Flashes and Foreign Materials in the Mould, Lack of Material Fed Into the Machine, and Operator Errors in Finishing. The proposed solutions include the installation of an alarm system for the machines, man-machine charts with an assignment guide database, a rejects prevention guide, 100% weighing of its products, implementation of statistical process control, and a revision of the system's acceptance sampling method. The computed net present value of the proposed solution is Php12,647,578 while the Php131,095 investment made is recoverable in 0.0318 years. Given these values, it shows that the proposed solutions for the main problem of rejects in grommets, o-rings, and packings are feasible to implement. Finally, when it comes to the implementation period, based on the Gantt chart that was constructed, these solutions can be applied within approximately 5 weeks. 2006-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/8691 Bachelor's Theses English Animo Repository Rubber industry and trade--Philippines Production management Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Rubber industry and trade--Philippines
Production management
Engineering
spellingShingle Rubber industry and trade--Philippines
Production management
Engineering
Ang, Tim Lexter
Meneses, Tomas David
Yuquico, Ryan
A systems study on the production department of J.F. Rubber Philippines, Inc.
description J.F Rubber Philippines is a company that manufactures rubber parts for the automotive and electronics industries. It is located at the People's Technology Complex - Special Economic Zone in Carmona, Cavite. The system study is concerned with the company's production department, more specifically on the products that undergo compression curing. The products identified to have the highest output are the grommets, o-rings, and packings which are all automotive parts used as sealants and coverings for the car or motorcycle's electronic components. The system exceeded its .25% target reject rate for compression by 2.36% during the year 2005. The company has therefore incurred Php9,653,914 in costs of rejects for the whole year. This is found to be the system's main problem. The main types of rejects that affect the products are Air Checks, Flow Cracks, Short Shots, Overtrim, Release Marks, Embedded Flashes and Deformation. After the evaluation of the probable causes, the identified causes for these rejects are Low Mould Temperature, Low Pressure, Improper Handling of Product While Still Hot, Improper Releasing Technique of Operator, Application of Too Much Silicone, Flashes and Foreign Materials in the Mould, Lack of Material Fed Into the Machine, and Operator Errors in Finishing. The proposed solutions include the installation of an alarm system for the machines, man-machine charts with an assignment guide database, a rejects prevention guide, 100% weighing of its products, implementation of statistical process control, and a revision of the system's acceptance sampling method. The computed net present value of the proposed solution is Php12,647,578 while the Php131,095 investment made is recoverable in 0.0318 years. Given these values, it shows that the proposed solutions for the main problem of rejects in grommets, o-rings, and packings are feasible to implement. Finally, when it comes to the implementation period, based on the Gantt chart that was constructed, these solutions can be applied within approximately 5 weeks.
format text
author Ang, Tim Lexter
Meneses, Tomas David
Yuquico, Ryan
author_facet Ang, Tim Lexter
Meneses, Tomas David
Yuquico, Ryan
author_sort Ang, Tim Lexter
title A systems study on the production department of J.F. Rubber Philippines, Inc.
title_short A systems study on the production department of J.F. Rubber Philippines, Inc.
title_full A systems study on the production department of J.F. Rubber Philippines, Inc.
title_fullStr A systems study on the production department of J.F. Rubber Philippines, Inc.
title_full_unstemmed A systems study on the production department of J.F. Rubber Philippines, Inc.
title_sort systems study on the production department of j.f. rubber philippines, inc.
publisher Animo Repository
publishDate 2006
url https://animorepository.dlsu.edu.ph/etd_bachelors/8691
_version_ 1772834844699525120