A system study on Gibson's Shoe Factory Incorporated

Gibson's Shoe Factory Incorporated is a shoe manufacturing company that specializes in the production of dress shoes and combat boots in Marikina. The company is often chosen by the Armed Forces of the Philippines as the main supplier of shoes due to its high quality and durability. As the year...

Full description

Saved in:
Bibliographic Details
Main Authors: Declaro, Jan Kenneth, Kang, Arvin Clarence G., Malcaba, Clarence John V.
Format: text
Language:English
Published: Animo Repository 2018
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/8844
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-9489
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-94892021-08-14T09:52:03Z A system study on Gibson's Shoe Factory Incorporated Declaro, Jan Kenneth Kang, Arvin Clarence G. Malcaba, Clarence John V. Gibson's Shoe Factory Incorporated is a shoe manufacturing company that specializes in the production of dress shoes and combat boots in Marikina. The company is often chosen by the Armed Forces of the Philippines as the main supplier of shoes due to its high quality and durability. As the years go by, the company envisions in maintaining and improving its operation in the shoe manufacturing industry both in the domestic and international markets. For the year of 2016, the company experienced an accumulated lateness of 57 calendar days on government agencies with a total of 13,489 combat shoes remaining to be produced resulting to a total penalty cost of Php9,755,040.00. After conducting a problem analysis through the use of a why-why diagram, the main four problems were found to be the following: (1) misplaced inventory (2) stockout of raw materials (3) machine breakdown and, (4) lost man-hours. Correspondingly, proposed solutions were created to improve the overall operations of the company. The final solutions include the following: (1) installation of racking system for the storage of raw materials (2) creation of inventory monitoring sheet (3) checklist to conduct preventive maintenance of machines and, (4) implementation of ventilation system. With all the final proposed solutions, three methods of cost-benefit analysis were done to check if the project is feasible in terms of cost. The first method is net-benefit analysis, in which the total net benefit of the project is Php2,822,972.32. The second method is return on investment, in which the computed value is 9.81. Lastly, the third method is payback period, in which the computed payback period is 0.09 years. 2018-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/8844 Bachelor's Theses English Animo Repository Shoe industry Manufacturing industries Gibson's Shoe Factory Inc Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Shoe industry
Manufacturing industries
Gibson's Shoe Factory Inc
Engineering
spellingShingle Shoe industry
Manufacturing industries
Gibson's Shoe Factory Inc
Engineering
Declaro, Jan Kenneth
Kang, Arvin Clarence G.
Malcaba, Clarence John V.
A system study on Gibson's Shoe Factory Incorporated
description Gibson's Shoe Factory Incorporated is a shoe manufacturing company that specializes in the production of dress shoes and combat boots in Marikina. The company is often chosen by the Armed Forces of the Philippines as the main supplier of shoes due to its high quality and durability. As the years go by, the company envisions in maintaining and improving its operation in the shoe manufacturing industry both in the domestic and international markets. For the year of 2016, the company experienced an accumulated lateness of 57 calendar days on government agencies with a total of 13,489 combat shoes remaining to be produced resulting to a total penalty cost of Php9,755,040.00. After conducting a problem analysis through the use of a why-why diagram, the main four problems were found to be the following: (1) misplaced inventory (2) stockout of raw materials (3) machine breakdown and, (4) lost man-hours. Correspondingly, proposed solutions were created to improve the overall operations of the company. The final solutions include the following: (1) installation of racking system for the storage of raw materials (2) creation of inventory monitoring sheet (3) checklist to conduct preventive maintenance of machines and, (4) implementation of ventilation system. With all the final proposed solutions, three methods of cost-benefit analysis were done to check if the project is feasible in terms of cost. The first method is net-benefit analysis, in which the total net benefit of the project is Php2,822,972.32. The second method is return on investment, in which the computed value is 9.81. Lastly, the third method is payback period, in which the computed payback period is 0.09 years.
format text
author Declaro, Jan Kenneth
Kang, Arvin Clarence G.
Malcaba, Clarence John V.
author_facet Declaro, Jan Kenneth
Kang, Arvin Clarence G.
Malcaba, Clarence John V.
author_sort Declaro, Jan Kenneth
title A system study on Gibson's Shoe Factory Incorporated
title_short A system study on Gibson's Shoe Factory Incorporated
title_full A system study on Gibson's Shoe Factory Incorporated
title_fullStr A system study on Gibson's Shoe Factory Incorporated
title_full_unstemmed A system study on Gibson's Shoe Factory Incorporated
title_sort system study on gibson's shoe factory incorporated
publisher Animo Repository
publishDate 2018
url https://animorepository.dlsu.edu.ph/etd_bachelors/8844
_version_ 1772834687308267520