A system study on the production line of Centro Manufacturing Corporation

A system study was conducted on Centro Manufacturing Corporation (CMC), a company that produces truck bodies. The company is in partnership with many different automotive companies in the Philippines. The study focuses on the Novaliches plant of CMC, which produces Mitsubishi L300 FB Deluxe and Exce...

Full description

Saved in:
Bibliographic Details
Main Authors: Lui, Emily O., Pagsisihan, Jason A., Si, Dianne Marie L.
Format: text
Language:English
Published: Animo Repository 2016
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/9138
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-9783
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-97832021-08-25T03:27:25Z A system study on the production line of Centro Manufacturing Corporation Lui, Emily O. Pagsisihan, Jason A. Si, Dianne Marie L. A system study was conducted on Centro Manufacturing Corporation (CMC), a company that produces truck bodies. The company is in partnership with many different automotive companies in the Philippines. The study focuses on the Novaliches plant of CMC, which produces Mitsubishi L300 FB Deluxe and Exceed, with a study period of January 2015 to December 2015. Based on the company's objectives, the company was evaluated by determining their strengths, weaknesses, opportunities and threats. Through WOT-SURG analysis, it was determined that the greatest problem of CMC is the unmet committed firmed orders (CFO) 236 units (210 Deluxe and 26 Exceed) for 2015 which led to an opportunity loss of Php8,186,458.56. This problem was furhter investigated by using a why why diagram to determine the root causes of the problem. The root causes of the problem are the long processing time of some processes due to lack of equipment and worker, insufficient raw materials due to ineffective raw material ordering. Wih this, the proposed system is for the company to purchase additional lifter for the metal treatment process and to transfer one worker from Levy second body filler to Levy body filler application. The effectivity and improvement by this proposal was supported using a simulation model from ARENA simulation software. Results of the simulation show that with the proposed system, the company can reach the required CFO. Moreover, to address the insufficiency of raw materials, the proposal is to have a new ordering system. An example of this is to use the tool, material resource planning (MRP). An Excel file was used to use MRP, and using historical data, trial-run was conducted. Results show that with the use of the new ordering system, the company can reduce the frequency of stock-outs in the inventory. The implementation of this proposed system led to an NPV of approximately Php8 million, and a payback period of less than one month. 2016-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/9138 Bachelor's Theses English Animo Repository System analysis Systems engineering Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic System analysis
Systems engineering
Engineering
spellingShingle System analysis
Systems engineering
Engineering
Lui, Emily O.
Pagsisihan, Jason A.
Si, Dianne Marie L.
A system study on the production line of Centro Manufacturing Corporation
description A system study was conducted on Centro Manufacturing Corporation (CMC), a company that produces truck bodies. The company is in partnership with many different automotive companies in the Philippines. The study focuses on the Novaliches plant of CMC, which produces Mitsubishi L300 FB Deluxe and Exceed, with a study period of January 2015 to December 2015. Based on the company's objectives, the company was evaluated by determining their strengths, weaknesses, opportunities and threats. Through WOT-SURG analysis, it was determined that the greatest problem of CMC is the unmet committed firmed orders (CFO) 236 units (210 Deluxe and 26 Exceed) for 2015 which led to an opportunity loss of Php8,186,458.56. This problem was furhter investigated by using a why why diagram to determine the root causes of the problem. The root causes of the problem are the long processing time of some processes due to lack of equipment and worker, insufficient raw materials due to ineffective raw material ordering. Wih this, the proposed system is for the company to purchase additional lifter for the metal treatment process and to transfer one worker from Levy second body filler to Levy body filler application. The effectivity and improvement by this proposal was supported using a simulation model from ARENA simulation software. Results of the simulation show that with the proposed system, the company can reach the required CFO. Moreover, to address the insufficiency of raw materials, the proposal is to have a new ordering system. An example of this is to use the tool, material resource planning (MRP). An Excel file was used to use MRP, and using historical data, trial-run was conducted. Results show that with the use of the new ordering system, the company can reduce the frequency of stock-outs in the inventory. The implementation of this proposed system led to an NPV of approximately Php8 million, and a payback period of less than one month.
format text
author Lui, Emily O.
Pagsisihan, Jason A.
Si, Dianne Marie L.
author_facet Lui, Emily O.
Pagsisihan, Jason A.
Si, Dianne Marie L.
author_sort Lui, Emily O.
title A system study on the production line of Centro Manufacturing Corporation
title_short A system study on the production line of Centro Manufacturing Corporation
title_full A system study on the production line of Centro Manufacturing Corporation
title_fullStr A system study on the production line of Centro Manufacturing Corporation
title_full_unstemmed A system study on the production line of Centro Manufacturing Corporation
title_sort system study on the production line of centro manufacturing corporation
publisher Animo Repository
publishDate 2016
url https://animorepository.dlsu.edu.ph/etd_bachelors/9138
_version_ 1772834807973150720