A system study on the Production Department of American Wire and Cable Co. Inc.

A system study was conducted on American Wire and Cable Inc., a company that manufactures and distributes quality electrical cable and wires in the Philippines. The study focuses on the product line of copper building wires manufacture in-house in the factory of American Wire and Cable Inc., for the...

Full description

Saved in:
Bibliographic Details
Main Authors: Cerrada, Julio Roberto O., Gamboa, Alvin Royce M., Gonzales, Inigo Rafael A.
Format: text
Language:English
Published: Animo Repository 2017
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/9144
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-9789
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-97892021-08-25T08:10:33Z A system study on the Production Department of American Wire and Cable Co. Inc. Cerrada, Julio Roberto O. Gamboa, Alvin Royce M. Gonzales, Inigo Rafael A. A system study was conducted on American Wire and Cable Inc., a company that manufactures and distributes quality electrical cable and wires in the Philippines. The study focuses on the product line of copper building wires manufacture in-house in the factory of American Wire and Cable Inc., for the study period from January 2016 to December 2016. Based on the company's specific goals for production quality and employee performance, the production process was evaluated to determine its strengths, weaknesses, opportunities, and threats. After the evaluation, a WOT-SURG situation appraisal was conducted on the present system and it was determined that American Wire's biggest problem in the production process is the finished good rejects which in 2016 incurred a total of 659.6 metric tons which is a deviation of 145.74 metric tons from the standard allowable amount, which resulted in annual opportunity loss of Php2,463,916.88. The problem, was further invested, and the identified root causes of the finished good rejects are the off-centered insulation, discoloration of insulation, and burnt insulation. To address these issues, multiple solutions were evaluated based on a set of criteria. The proposed solutions were chosen to address each of the three main causes. The installation of a pressure relief gear pump, use of a commercial purging agent flush out colorant, and a color-coded labelling scheme for the temperature settings were the solutions chosen to address the three main causes of the finished good rejects. The proposed solutions have a net present value Php6,436,449.38 for five years with an expected payback period of less than two weeks. 2017-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/9144 Bachelor's Theses English Animo Repository System analysis Systems engineering Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic System analysis
Systems engineering
Engineering
spellingShingle System analysis
Systems engineering
Engineering
Cerrada, Julio Roberto O.
Gamboa, Alvin Royce M.
Gonzales, Inigo Rafael A.
A system study on the Production Department of American Wire and Cable Co. Inc.
description A system study was conducted on American Wire and Cable Inc., a company that manufactures and distributes quality electrical cable and wires in the Philippines. The study focuses on the product line of copper building wires manufacture in-house in the factory of American Wire and Cable Inc., for the study period from January 2016 to December 2016. Based on the company's specific goals for production quality and employee performance, the production process was evaluated to determine its strengths, weaknesses, opportunities, and threats. After the evaluation, a WOT-SURG situation appraisal was conducted on the present system and it was determined that American Wire's biggest problem in the production process is the finished good rejects which in 2016 incurred a total of 659.6 metric tons which is a deviation of 145.74 metric tons from the standard allowable amount, which resulted in annual opportunity loss of Php2,463,916.88. The problem, was further invested, and the identified root causes of the finished good rejects are the off-centered insulation, discoloration of insulation, and burnt insulation. To address these issues, multiple solutions were evaluated based on a set of criteria. The proposed solutions were chosen to address each of the three main causes. The installation of a pressure relief gear pump, use of a commercial purging agent flush out colorant, and a color-coded labelling scheme for the temperature settings were the solutions chosen to address the three main causes of the finished good rejects. The proposed solutions have a net present value Php6,436,449.38 for five years with an expected payback period of less than two weeks.
format text
author Cerrada, Julio Roberto O.
Gamboa, Alvin Royce M.
Gonzales, Inigo Rafael A.
author_facet Cerrada, Julio Roberto O.
Gamboa, Alvin Royce M.
Gonzales, Inigo Rafael A.
author_sort Cerrada, Julio Roberto O.
title A system study on the Production Department of American Wire and Cable Co. Inc.
title_short A system study on the Production Department of American Wire and Cable Co. Inc.
title_full A system study on the Production Department of American Wire and Cable Co. Inc.
title_fullStr A system study on the Production Department of American Wire and Cable Co. Inc.
title_full_unstemmed A system study on the Production Department of American Wire and Cable Co. Inc.
title_sort system study on the production department of american wire and cable co. inc.
publisher Animo Repository
publishDate 2017
url https://animorepository.dlsu.edu.ph/etd_bachelors/9144
_version_ 1772834748466462720