A system study on the swithcgear production of Asiaphil Electric Batangas Inc.
A system study was conducted in the switchgear of Asiaphil Electric Batangas, Inc. The company sells electronic products such as switchgears, circuit breakers, transformers, capacitors and the like. They are the ones who only sell these kinds of products in the Philippines. The study focuses on the...
Saved in:
Main Authors: | , , , |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
2019
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_bachelors/9145 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |
id |
oai:animorepository.dlsu.edu.ph:etd_bachelors-9790 |
---|---|
record_format |
eprints |
spelling |
oai:animorepository.dlsu.edu.ph:etd_bachelors-97902021-08-25T08:08:40Z A system study on the swithcgear production of Asiaphil Electric Batangas Inc. Angeles, Roberto Rafael Brizuela, Jet Niko De Guzman, Anna Patricia Gutierrez, Alma Maria Jennifer, panel chair, A system study was conducted in the switchgear of Asiaphil Electric Batangas, Inc. The company sells electronic products such as switchgears, circuit breakers, transformers, capacitors and the like. They are the ones who only sell these kinds of products in the Philippines. The study focuses on the inventory management and how it affects the production of switchgears. The data used is from January 2017 to December 2017. Furthermore, the study was conducted based on the company's specific goals and objectives that were used to evaluate their strengths, weaknesses, opportunities, and threats. Afterwards, a WOT-SURG analysis has been conducted in order to determine the problem of the company which has the highest priority. It was determined that the company has an inventory accuracy of 83.29% which deviates from a problem by 11.71% incurring a cost of Php55,040,797.66. The causes of the problem were determined by conducting a why-why analysis and it was determined that the causes were manual counting of on hand inventory, poor warehouse organization and management, and raw material damages during assembly or testing. Moreover, the possible solutions were determined by using the Kepner-Tregoe decision analysis and there were four alternative solutions include implementing proper documentation, invest in a warehouse management system software, and invest in labels and signs. 2019-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/9145 Bachelor's Theses English Animo Repository System analysis Systems engineering Industrial engineering |
institution |
De La Salle University |
building |
De La Salle University Library |
continent |
Asia |
country |
Philippines Philippines |
content_provider |
De La Salle University Library |
collection |
DLSU Institutional Repository |
language |
English |
topic |
System analysis Systems engineering Industrial engineering |
spellingShingle |
System analysis Systems engineering Industrial engineering Angeles, Roberto Rafael Brizuela, Jet Niko De Guzman, Anna Patricia Gutierrez, Alma Maria Jennifer, panel chair, A system study on the swithcgear production of Asiaphil Electric Batangas Inc. |
description |
A system study was conducted in the switchgear of Asiaphil Electric Batangas, Inc. The company sells electronic products such as switchgears, circuit breakers, transformers, capacitors and the like. They are the ones who only sell these kinds of products in the Philippines. The study focuses on the inventory management and how it affects the production of switchgears. The data used is from January 2017 to December 2017. Furthermore, the study was conducted based on the company's specific goals and objectives that were used to evaluate their strengths, weaknesses, opportunities, and threats. Afterwards, a WOT-SURG analysis has been conducted in order to determine the problem of the company which has the highest priority. It was determined that the company has an inventory accuracy of 83.29% which deviates from a problem by 11.71% incurring a cost of Php55,040,797.66.
The causes of the problem were determined by conducting a why-why analysis and it was determined that the causes were manual counting of on hand inventory, poor warehouse organization and management, and raw material damages during assembly or testing. Moreover, the possible solutions were determined by using the Kepner-Tregoe decision analysis and there were four alternative solutions include implementing proper documentation, invest in a warehouse management system software, and invest in labels and signs. |
format |
text |
author |
Angeles, Roberto Rafael Brizuela, Jet Niko De Guzman, Anna Patricia Gutierrez, Alma Maria Jennifer, panel chair, |
author_facet |
Angeles, Roberto Rafael Brizuela, Jet Niko De Guzman, Anna Patricia Gutierrez, Alma Maria Jennifer, panel chair, |
author_sort |
Angeles, Roberto Rafael |
title |
A system study on the swithcgear production of Asiaphil Electric Batangas Inc. |
title_short |
A system study on the swithcgear production of Asiaphil Electric Batangas Inc. |
title_full |
A system study on the swithcgear production of Asiaphil Electric Batangas Inc. |
title_fullStr |
A system study on the swithcgear production of Asiaphil Electric Batangas Inc. |
title_full_unstemmed |
A system study on the swithcgear production of Asiaphil Electric Batangas Inc. |
title_sort |
system study on the swithcgear production of asiaphil electric batangas inc. |
publisher |
Animo Repository |
publishDate |
2019 |
url |
https://animorepository.dlsu.edu.ph/etd_bachelors/9145 |
_version_ |
1772834870025781248 |