A systems study on the outbound process of Primer Group of Companies

Primer Group of Companies includes 5 strategic business units (SBUs) which houses different brands held by the company. Of which, the SBU constituting the highest sales is Kenrich International Distribution Corp. (KIDC) which handles brands such as Fitflop, Adidas, Dc and Roxy among many others. The...

Full description

Saved in:
Bibliographic Details
Main Authors: Manalang, Iana Agnieszka B., Sibal, Christelle Faye R., Thai, Jathniel S., Sy, Charlle, panel chair
Format: text
Language:English
Published: Animo Repository 2018
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/9152
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-9797
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-97972021-08-25T13:48:56Z A systems study on the outbound process of Primer Group of Companies Manalang, Iana Agnieszka B. Sibal, Christelle Faye R. Thai, Jathniel S. Sy, Charlle, panel chair, Primer Group of Companies includes 5 strategic business units (SBUs) which houses different brands held by the company. Of which, the SBU constituting the highest sales is Kenrich International Distribution Corp. (KIDC) which handles brands such as Fitflop, Adidas, Dc and Roxy among many others. The outbound process in their warehouse in Bicutan, Philippines became the focus of the study as it caters to multiple merchandise stores all over Metro Manila and other regions of Luzon and is critical to the operations of the company. Their key performance indicators include on-time shipment, fill-rate per order, and inventory record accuracy. In the year 2016, the outbound on-time shipment deviated from 7.5% from the target level of 95%. This resulted to a total opportunity loss of Php240,695,635.09 relating to the items that were not sold due to their late delivery. A 7.5 deviation from the target was attributed to this issue, making it the main problem of this study. A why-why method was conducted to enumerate the possible causes of the problem. These were then validated in order to identify their contribution to the problem. The causes were attributed to prolonged processes due to inefficiencies in the system. Main processes such as picking, packing, document processing, and dispatching had attributed issues that prolong the processes thus incurring delays in deliveries. Alternative solutions were suggested and evaluated using the Kepner Tregoe decision analysis with criteria relating to ease of transition, costs incurred, contribution to long-term growth, and employee resistance. The solutions include acquisition of new equipment, implementation of a barcode system, segregation of boxes according to size, attachment of box label information before sealing during packing, incorporation of encoding in barcode scanning during document processing, and conducting random sampling when the orders are about to be dispatched. These final solutions addressing the validated root causes were subjected to a cost-benefit analysis where it was found that the payback period for the costs attributed to the solutions is 2 months, and an implementation plan providing plans for training and preparation, trial run, and evaluation of trial run was presented in which the company may use when they roll out the solutions. 2018-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/9152 Bachelor's Theses English Animo Repository System analysis Systems engineering PRIMER Group of Companies
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic System analysis
Systems engineering
PRIMER Group of Companies
spellingShingle System analysis
Systems engineering
PRIMER Group of Companies
Manalang, Iana Agnieszka B.
Sibal, Christelle Faye R.
Thai, Jathniel S.
Sy, Charlle, panel chair,
A systems study on the outbound process of Primer Group of Companies
description Primer Group of Companies includes 5 strategic business units (SBUs) which houses different brands held by the company. Of which, the SBU constituting the highest sales is Kenrich International Distribution Corp. (KIDC) which handles brands such as Fitflop, Adidas, Dc and Roxy among many others. The outbound process in their warehouse in Bicutan, Philippines became the focus of the study as it caters to multiple merchandise stores all over Metro Manila and other regions of Luzon and is critical to the operations of the company. Their key performance indicators include on-time shipment, fill-rate per order, and inventory record accuracy. In the year 2016, the outbound on-time shipment deviated from 7.5% from the target level of 95%. This resulted to a total opportunity loss of Php240,695,635.09 relating to the items that were not sold due to their late delivery. A 7.5 deviation from the target was attributed to this issue, making it the main problem of this study. A why-why method was conducted to enumerate the possible causes of the problem. These were then validated in order to identify their contribution to the problem. The causes were attributed to prolonged processes due to inefficiencies in the system. Main processes such as picking, packing, document processing, and dispatching had attributed issues that prolong the processes thus incurring delays in deliveries. Alternative solutions were suggested and evaluated using the Kepner Tregoe decision analysis with criteria relating to ease of transition, costs incurred, contribution to long-term growth, and employee resistance. The solutions include acquisition of new equipment, implementation of a barcode system, segregation of boxes according to size, attachment of box label information before sealing during packing, incorporation of encoding in barcode scanning during document processing, and conducting random sampling when the orders are about to be dispatched. These final solutions addressing the validated root causes were subjected to a cost-benefit analysis where it was found that the payback period for the costs attributed to the solutions is 2 months, and an implementation plan providing plans for training and preparation, trial run, and evaluation of trial run was presented in which the company may use when they roll out the solutions.
format text
author Manalang, Iana Agnieszka B.
Sibal, Christelle Faye R.
Thai, Jathniel S.
Sy, Charlle, panel chair,
author_facet Manalang, Iana Agnieszka B.
Sibal, Christelle Faye R.
Thai, Jathniel S.
Sy, Charlle, panel chair,
author_sort Manalang, Iana Agnieszka B.
title A systems study on the outbound process of Primer Group of Companies
title_short A systems study on the outbound process of Primer Group of Companies
title_full A systems study on the outbound process of Primer Group of Companies
title_fullStr A systems study on the outbound process of Primer Group of Companies
title_full_unstemmed A systems study on the outbound process of Primer Group of Companies
title_sort systems study on the outbound process of primer group of companies
publisher Animo Repository
publishDate 2018
url https://animorepository.dlsu.edu.ph/etd_bachelors/9152
_version_ 1772834789217271808