A system study on the Minola assembly process of CTY, Incorporated

CTY Incorporated was organized in 1974 to undertake the manufacture of the Armed Forces (AF) tactical radios with the secondary perspective of giving employment to the qualified veterans. Consequently, the AF commissioned CTY to develop radio sets and ancillaries. Currently, CTY continues the commer...

Full description

Saved in:
Bibliographic Details
Main Authors: Castaneda, Jovel Martin M., Tenorio, Arthur Ryan S., Yabes, Vincent Vergil A.
Format: text
Language:English
Published: Animo Repository 1997
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/9155
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-9800
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-98002021-08-25T14:16:14Z A system study on the Minola assembly process of CTY, Incorporated Castaneda, Jovel Martin M. Tenorio, Arthur Ryan S. Yabes, Vincent Vergil A. CTY Incorporated was organized in 1974 to undertake the manufacture of the Armed Forces (AF) tactical radios with the secondary perspective of giving employment to the qualified veterans. Consequently, the AF commissioned CTY to develop radio sets and ancillaries. Currently, CTY continues the commercial sub-contract projects such as Flapper and Minola. The study focuses on the company's manufacturing process of Minola products. This is in connection with the company's search for alternatives to recover its past losses and at the same time find ways to win back the trust and confidence of the AF. This includes all departments involved with the receiving and storage of raw materials and the processing of these raw materials to obtain finished goods. Other projects are not included. There are four models assembled by CTY Inc. for Minola. These models are 2099, 2429, 2101, and 2202 which are board parts of cameras. The company is only paid for the assembly of the boards. Production has direct relationships with Production, Planning and Materials Control (PPMC), Engineering, and Quality Control / Quality Assurance (QCQA) departments. The customer specifies production volume and deadline dates for PPMC, relays consumable specifications to Engineering, and sets quality standards for QCQA. In turn, PPMC, QCQA, and Engineering coordinate with one another to achieve customer requirements and demand. Problems of the company were evaluated using Pareto Analysis. Results showed that 80% of the weaknesses identified are composed of deviations from production of three models. These are additional monthly costs for the production of models 2202, 2099, and 2101. It is found that the three models have common rejects incurred in the assembly process. These are rejects found by QC and QA. Considering all the models including 2429, the additional costs are due to the rejects from QC/QA. Consequently, rejects, whatever type it may be, is caused mainly of manual operations. These manual errors may be caused by worki 1997-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/9155 Bachelor's Theses English Animo Repository System analysis Assembly-line methods Production engineering Electronic industries Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic System analysis
Assembly-line methods
Production engineering
Electronic industries
Engineering
spellingShingle System analysis
Assembly-line methods
Production engineering
Electronic industries
Engineering
Castaneda, Jovel Martin M.
Tenorio, Arthur Ryan S.
Yabes, Vincent Vergil A.
A system study on the Minola assembly process of CTY, Incorporated
description CTY Incorporated was organized in 1974 to undertake the manufacture of the Armed Forces (AF) tactical radios with the secondary perspective of giving employment to the qualified veterans. Consequently, the AF commissioned CTY to develop radio sets and ancillaries. Currently, CTY continues the commercial sub-contract projects such as Flapper and Minola. The study focuses on the company's manufacturing process of Minola products. This is in connection with the company's search for alternatives to recover its past losses and at the same time find ways to win back the trust and confidence of the AF. This includes all departments involved with the receiving and storage of raw materials and the processing of these raw materials to obtain finished goods. Other projects are not included. There are four models assembled by CTY Inc. for Minola. These models are 2099, 2429, 2101, and 2202 which are board parts of cameras. The company is only paid for the assembly of the boards. Production has direct relationships with Production, Planning and Materials Control (PPMC), Engineering, and Quality Control / Quality Assurance (QCQA) departments. The customer specifies production volume and deadline dates for PPMC, relays consumable specifications to Engineering, and sets quality standards for QCQA. In turn, PPMC, QCQA, and Engineering coordinate with one another to achieve customer requirements and demand. Problems of the company were evaluated using Pareto Analysis. Results showed that 80% of the weaknesses identified are composed of deviations from production of three models. These are additional monthly costs for the production of models 2202, 2099, and 2101. It is found that the three models have common rejects incurred in the assembly process. These are rejects found by QC and QA. Considering all the models including 2429, the additional costs are due to the rejects from QC/QA. Consequently, rejects, whatever type it may be, is caused mainly of manual operations. These manual errors may be caused by worki
format text
author Castaneda, Jovel Martin M.
Tenorio, Arthur Ryan S.
Yabes, Vincent Vergil A.
author_facet Castaneda, Jovel Martin M.
Tenorio, Arthur Ryan S.
Yabes, Vincent Vergil A.
author_sort Castaneda, Jovel Martin M.
title A system study on the Minola assembly process of CTY, Incorporated
title_short A system study on the Minola assembly process of CTY, Incorporated
title_full A system study on the Minola assembly process of CTY, Incorporated
title_fullStr A system study on the Minola assembly process of CTY, Incorporated
title_full_unstemmed A system study on the Minola assembly process of CTY, Incorporated
title_sort system study on the minola assembly process of cty, incorporated
publisher Animo Repository
publishDate 1997
url https://animorepository.dlsu.edu.ph/etd_bachelors/9155
_version_ 1772834789389238272