A system study on the production department of EMCY Shoes Company

Emcy Shoes is a small scale shoe manufacturing company. They are engaged in the production of different varieties of high fashion shoes for formal, office, school attire which they deliver to a pool of well-known boutiques. The proponents performed a system study on the production process of the com...

Full description

Saved in:
Bibliographic Details
Main Authors: Kapalungan, Florisa, Laya, Anna Lissa, Ortiz, Amparo
Format: text
Language:English
Published: Animo Repository 1996
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/9172
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-9817
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-98172021-08-26T03:12:56Z A system study on the production department of EMCY Shoes Company Kapalungan, Florisa Laya, Anna Lissa Ortiz, Amparo Emcy Shoes is a small scale shoe manufacturing company. They are engaged in the production of different varieties of high fashion shoes for formal, office, school attire which they deliver to a pool of well-known boutiques. The proponents performed a system study on the production process of the company. After three months of observations, interviews, surveys, and gathering of data in the present system of production of the company, the group came up with concerns regarding the production process through the use of WOT-SURG analysis. The group used both Streamline and Cause and Effect Analysis to identify the main causes of the problem concerned. The problem that was identified by the group is about the unbalanced line which has a low efficiency of only 65.33% leading to unmet demand equivalent to a profit loss of P 19,019.00. Under this, the company experiences delays in delivery with penalty cost of P 16,100.00 and unmet demand of 765 pairs in 11 weeks, since it does not maximize its efficiency. Again, based on the Streamline and Cause and Effect analysis, the main causes of the problem was determined and that was low production output, unskilled workers, and uncomfortable working condition. The group came up with alternative solutions by which to solve the problem. Through analysis and simulation using Simfactory, the best alternative solution was chosen. The new system can produced 29.19 units with a given efficiency of 92.48% per day as compared to 24.33 units with a given efficiency of 70.96% per day. Given the new efficiency the company will now be able to increase production by 3.84 pairs per day resulting 169 pairs per week thus, meeting the demand. 1996-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/9172 Bachelor's Theses English Animo Repository System analysis Production engineering Assembly-line methods Industrial management Shoes Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic System analysis
Production engineering
Assembly-line methods
Industrial management
Shoes
Engineering
spellingShingle System analysis
Production engineering
Assembly-line methods
Industrial management
Shoes
Engineering
Kapalungan, Florisa
Laya, Anna Lissa
Ortiz, Amparo
A system study on the production department of EMCY Shoes Company
description Emcy Shoes is a small scale shoe manufacturing company. They are engaged in the production of different varieties of high fashion shoes for formal, office, school attire which they deliver to a pool of well-known boutiques. The proponents performed a system study on the production process of the company. After three months of observations, interviews, surveys, and gathering of data in the present system of production of the company, the group came up with concerns regarding the production process through the use of WOT-SURG analysis. The group used both Streamline and Cause and Effect Analysis to identify the main causes of the problem concerned. The problem that was identified by the group is about the unbalanced line which has a low efficiency of only 65.33% leading to unmet demand equivalent to a profit loss of P 19,019.00. Under this, the company experiences delays in delivery with penalty cost of P 16,100.00 and unmet demand of 765 pairs in 11 weeks, since it does not maximize its efficiency. Again, based on the Streamline and Cause and Effect analysis, the main causes of the problem was determined and that was low production output, unskilled workers, and uncomfortable working condition. The group came up with alternative solutions by which to solve the problem. Through analysis and simulation using Simfactory, the best alternative solution was chosen. The new system can produced 29.19 units with a given efficiency of 92.48% per day as compared to 24.33 units with a given efficiency of 70.96% per day. Given the new efficiency the company will now be able to increase production by 3.84 pairs per day resulting 169 pairs per week thus, meeting the demand.
format text
author Kapalungan, Florisa
Laya, Anna Lissa
Ortiz, Amparo
author_facet Kapalungan, Florisa
Laya, Anna Lissa
Ortiz, Amparo
author_sort Kapalungan, Florisa
title A system study on the production department of EMCY Shoes Company
title_short A system study on the production department of EMCY Shoes Company
title_full A system study on the production department of EMCY Shoes Company
title_fullStr A system study on the production department of EMCY Shoes Company
title_full_unstemmed A system study on the production department of EMCY Shoes Company
title_sort system study on the production department of emcy shoes company
publisher Animo Repository
publishDate 1996
url https://animorepository.dlsu.edu.ph/etd_bachelors/9172
_version_ 1772834671770468352