Effective management of monthly reporting process through the use of project management tools towards a better work- life balance

The finance team of PwC SDC Manila is the focal unit of this action research. The team faced challenges such as the absence of the finance controller, changes in the accounting system, resignation, multiple audits, and compliance with regulatory requirements on an expansion project. When this happen...

Full description

Saved in:
Bibliographic Details
Main Author: Garcia, Loriedee
Format: text
Language:English
Published: Animo Repository 2018
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_masteral/5613
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_masteral-12451
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_masteral-124512021-01-28T07:03:08Z Effective management of monthly reporting process through the use of project management tools towards a better work- life balance Garcia, Loriedee The finance team of PwC SDC Manila is the focal unit of this action research. The team faced challenges such as the absence of the finance controller, changes in the accounting system, resignation, multiple audits, and compliance with regulatory requirements on an expansion project. When this happened all the same time, the team missed deadlines and team members have gone exhausted rendering too much overtime. The primary objective of this action research is to change the finance teams planning from none or individually driven (by the finance controller) to a regular (monthly) and structured group planning. After establishing a regular planning exercise, the team aims to reduce the lead time in completing the monthly management report from 6-9 working days to 3-5 working days after month-end with less than 5 hours maximum overtime (per day, per employee) on the subsequent month-end period after implementing the change. To address the issue, team used a combination of the DMAIC framework and Lewins change model. I primarily used Scheins ORJI model as a tool for first person inquiry. The team conducted a series of team meetings and one-one-one discussions during the action research cycles that comprise my second person inquiry. I further added different articles on planning, six sigma and project management as a guide for the interventions that form part of my third person inquiry. Improved lead-time in completing the management reports and a reduction in overtime were seen as the research success indicators after the second intervention. An improvement in the work-life balance was also achieved in doing this action research. Through this Insider Action Research experience, the individuals became a team. 2018-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_masteral/5613 Master's Theses English Animo Repository Work-life balance Organizational change Continuous improvement process
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Work-life balance
Organizational change
Continuous improvement process
spellingShingle Work-life balance
Organizational change
Continuous improvement process
Garcia, Loriedee
Effective management of monthly reporting process through the use of project management tools towards a better work- life balance
description The finance team of PwC SDC Manila is the focal unit of this action research. The team faced challenges such as the absence of the finance controller, changes in the accounting system, resignation, multiple audits, and compliance with regulatory requirements on an expansion project. When this happened all the same time, the team missed deadlines and team members have gone exhausted rendering too much overtime. The primary objective of this action research is to change the finance teams planning from none or individually driven (by the finance controller) to a regular (monthly) and structured group planning. After establishing a regular planning exercise, the team aims to reduce the lead time in completing the monthly management report from 6-9 working days to 3-5 working days after month-end with less than 5 hours maximum overtime (per day, per employee) on the subsequent month-end period after implementing the change. To address the issue, team used a combination of the DMAIC framework and Lewins change model. I primarily used Scheins ORJI model as a tool for first person inquiry. The team conducted a series of team meetings and one-one-one discussions during the action research cycles that comprise my second person inquiry. I further added different articles on planning, six sigma and project management as a guide for the interventions that form part of my third person inquiry. Improved lead-time in completing the management reports and a reduction in overtime were seen as the research success indicators after the second intervention. An improvement in the work-life balance was also achieved in doing this action research. Through this Insider Action Research experience, the individuals became a team.
format text
author Garcia, Loriedee
author_facet Garcia, Loriedee
author_sort Garcia, Loriedee
title Effective management of monthly reporting process through the use of project management tools towards a better work- life balance
title_short Effective management of monthly reporting process through the use of project management tools towards a better work- life balance
title_full Effective management of monthly reporting process through the use of project management tools towards a better work- life balance
title_fullStr Effective management of monthly reporting process through the use of project management tools towards a better work- life balance
title_full_unstemmed Effective management of monthly reporting process through the use of project management tools towards a better work- life balance
title_sort effective management of monthly reporting process through the use of project management tools towards a better work- life balance
publisher Animo Repository
publishDate 2018
url https://animorepository.dlsu.edu.ph/etd_masteral/5613
_version_ 1772835548242640896