An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH
Project monitoring is an activity that involves a continuous and systematic observation and checking of the current state of a project. However, in the Philippines, COA reports in recent years revealed that there were deficiencies worth billions of pesos in some projects of the DPWH that are caused...
Saved in:
Main Author: | |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
2020
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_masteral/5934 https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=12924&context=etd_masteral |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |
id |
oai:animorepository.dlsu.edu.ph:etd_masteral-12924 |
---|---|
record_format |
eprints |
spelling |
oai:animorepository.dlsu.edu.ph:etd_masteral-129242022-04-18T07:40:35Z An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH Cunanan, Paul Justine S. Project monitoring is an activity that involves a continuous and systematic observation and checking of the current state of a project. However, in the Philippines, COA reports in recent years revealed that there were deficiencies worth billions of pesos in some projects of the DPWH that are caused by poor monitoring practices. One cause of these problems is the chronic misreporting of the accomplishment of projects. This practice has been rampant in the DPWH until now, despite the continuous recommendations from experts and other agencies of the government. The objective of this study is to find the reasons for the persistent problem of misreporting of accomplishment of projects in the DPWH with the use of Williamson’s Four Levels of Institutional Analysis. The source of primary data is collected from participant observation of the researcher and in-depth interviews of the engineers in the DPWH. Evidence using the framework revealed that project monitoring has problems at all levels. The first level emphasizes embeddedness of an institution. It was discovered that bloating of accomplishment of projects and corruption had already been part of the norms in the DPWH. These informal institutions evolved and remained beneath the many changes in formal institutions. The second level of institutional analysis is about the institutional environment or the formal rules of the game. This level exposes problems in manpower in the implementing offices of DPWH – Region I which affect the accuracy of data reflected in PCMA. Adding to this are policies of the DPWH that negatively affect the effectiveness of the use of PCMA. It was also discovered data validation, which ensures the correctness of data in PCMA, is not frequently conducted and has no specific guidelines. The third level, institutions of governance (play of the game), shed the light on problems in rule enforcement. The mutual relationship among the engineers and the contractors resulted in a systematic misreporting of projects in the IOs. The frequent non-implementation of sanctions among the engineers promotes misreporting of accomplishment of projects with minimal risks. The last level focuses on individual actors. This shows the problems on the basis of incentives in relation to the physical and financial targets of the agency and the lack of accountability in project monitoring. The findings of this study can be used in the formulation, implementation, and further improvements of policies among the agencies of the government, especially in the DPWH. 2020-05-01T07:00:00Z text application/pdf https://animorepository.dlsu.edu.ph/etd_masteral/5934 https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=12924&context=etd_masteral Master's Theses English Animo Repository Infrastructure (Economics)--Philippines Public works--Philippines Philippines.Department of Public Works and Highways Infrastructure Public Affairs, Public Policy and Public Administration |
institution |
De La Salle University |
building |
De La Salle University Library |
continent |
Asia |
country |
Philippines Philippines |
content_provider |
De La Salle University Library |
collection |
DLSU Institutional Repository |
language |
English |
topic |
Infrastructure (Economics)--Philippines Public works--Philippines Philippines.Department of Public Works and Highways Infrastructure Public Affairs, Public Policy and Public Administration |
spellingShingle |
Infrastructure (Economics)--Philippines Public works--Philippines Philippines.Department of Public Works and Highways Infrastructure Public Affairs, Public Policy and Public Administration Cunanan, Paul Justine S. An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH |
description |
Project monitoring is an activity that involves a continuous and systematic observation and checking of the current state of a project. However, in the Philippines, COA reports in recent years revealed that there were deficiencies worth billions of pesos in some projects of the DPWH that are caused by poor monitoring practices. One cause of these problems is the chronic misreporting of the accomplishment of projects. This practice has been rampant in the DPWH until now, despite the continuous recommendations from experts and other agencies of the government. The objective of this study is to find the reasons for the persistent problem of misreporting of accomplishment of projects in the DPWH with the use of Williamson’s Four Levels of Institutional Analysis. The source of primary data is collected from participant observation of the researcher and in-depth interviews of the engineers in the DPWH. Evidence using the framework revealed that project monitoring has problems at all levels. The first level emphasizes embeddedness of an institution. It was discovered that bloating of accomplishment of projects and corruption had already been part of the norms in the DPWH. These informal institutions evolved and remained beneath the many changes in formal institutions. The second level of institutional analysis is about the institutional environment or the formal rules of the game. This level exposes problems in manpower in the implementing offices of DPWH – Region I which affect the accuracy of data reflected in PCMA. Adding to this are policies of the DPWH that negatively affect the effectiveness of the use of PCMA. It was also discovered data validation, which ensures the correctness of data in PCMA, is not frequently conducted and has no specific guidelines. The third level, institutions of governance (play of the game), shed the light on problems in rule enforcement. The mutual relationship among the engineers and the contractors resulted in a systematic misreporting of projects in the IOs. The frequent non-implementation of sanctions among the engineers promotes misreporting of accomplishment of projects with minimal risks. The last level focuses on individual actors. This shows the problems on the basis of incentives in relation to the physical and financial targets of the agency and the lack of accountability in project monitoring. The findings of this study can be used in the formulation, implementation, and further improvements of policies among the agencies of the government, especially in the DPWH. |
format |
text |
author |
Cunanan, Paul Justine S. |
author_facet |
Cunanan, Paul Justine S. |
author_sort |
Cunanan, Paul Justine S. |
title |
An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH |
title_short |
An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH |
title_full |
An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH |
title_fullStr |
An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH |
title_full_unstemmed |
An analysis of the problems on the reporting of accomplishment of infrastructure projects in the DPWH |
title_sort |
analysis of the problems on the reporting of accomplishment of infrastructure projects in the dpwh |
publisher |
Animo Repository |
publishDate |
2020 |
url |
https://animorepository.dlsu.edu.ph/etd_masteral/5934 https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=12924&context=etd_masteral |
_version_ |
1731309202688704512 |