Development of a database management system for infrastructure project planning of Department of Public Works and Highways (DPWH)
Currently, the preparation of the RBP is being done through the prescribed format from the CO. Said format is in Excel template and being filled out by the ROs and DEOs during budget preparation planning stage and eventually for submission to CO. As observed, the format, being in Excel, is easy to m...
Saved in:
Main Author: | |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
2020
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_masteral/6414 https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=13497&context=etd_masteral |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |
id |
oai:animorepository.dlsu.edu.ph:etd_masteral-13497 |
---|---|
record_format |
eprints |
spelling |
oai:animorepository.dlsu.edu.ph:etd_masteral-134972022-10-07T23:46:59Z Development of a database management system for infrastructure project planning of Department of Public Works and Highways (DPWH) Papa, Juan Carlo B. Currently, the preparation of the RBP is being done through the prescribed format from the CO. Said format is in Excel template and being filled out by the ROs and DEOs during budget preparation planning stage and eventually for submission to CO. As observed, the format, being in Excel, is easy to modify as ROs and DEOs have the tendency to add or delete information resulting to different report formats and erroneous data thus significantly prolonging the process of budget preparation and finalization of the same. Having an accurate and standardized data submitted will significantly shorten the time of finalizing the report (for final approval and implementation); speedy implementation will mean attaining the objective of completing the project on time; completing the project on time will result to efficient service to the people as the facilities can already use by the end-user; with the available facilities such as roads and bridges, economic activities will be enhanced; ordinary people will directly benefit from it; DPWH image will improve because people are satisfied with the facilities; as a result, DPWH employees morale will be high; if the morale is high, employees are motivated to work thus productivity will further improve. 2020-06-01T07:00:00Z text application/pdf https://animorepository.dlsu.edu.ph/etd_masteral/6414 https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=13497&context=etd_masteral Master's Theses English Animo Repository Philippines. Department of Public Works and Highways—Information resources management Management information systems Construction Engineering and Management |
institution |
De La Salle University |
building |
De La Salle University Library |
continent |
Asia |
country |
Philippines Philippines |
content_provider |
De La Salle University Library |
collection |
DLSU Institutional Repository |
language |
English |
topic |
Philippines. Department of Public Works and Highways—Information resources management Management information systems Construction Engineering and Management |
spellingShingle |
Philippines. Department of Public Works and Highways—Information resources management Management information systems Construction Engineering and Management Papa, Juan Carlo B. Development of a database management system for infrastructure project planning of Department of Public Works and Highways (DPWH) |
description |
Currently, the preparation of the RBP is being done through the prescribed format from the CO. Said format is in Excel template and being filled out by the ROs and DEOs during budget preparation planning stage and eventually for submission to CO. As observed, the format, being in Excel, is easy to modify as ROs and DEOs have the tendency to add or delete information resulting to different report formats and erroneous data thus significantly prolonging the process of budget preparation and finalization of the same. Having an accurate and standardized data submitted will significantly shorten the time of finalizing the report (for final approval and implementation); speedy implementation will mean attaining the objective of completing the project on time; completing the project on time will result to efficient service to the people as the facilities can already use by the end-user; with the available facilities such as roads and bridges, economic activities will be enhanced; ordinary people will directly benefit from it; DPWH image will improve because people are satisfied with the facilities; as a result, DPWH employees morale will be high; if the morale is high, employees are motivated to work thus productivity will further improve. |
format |
text |
author |
Papa, Juan Carlo B. |
author_facet |
Papa, Juan Carlo B. |
author_sort |
Papa, Juan Carlo B. |
title |
Development of a database management system for infrastructure project planning of Department of Public Works and Highways (DPWH) |
title_short |
Development of a database management system for infrastructure project planning of Department of Public Works and Highways (DPWH) |
title_full |
Development of a database management system for infrastructure project planning of Department of Public Works and Highways (DPWH) |
title_fullStr |
Development of a database management system for infrastructure project planning of Department of Public Works and Highways (DPWH) |
title_full_unstemmed |
Development of a database management system for infrastructure project planning of Department of Public Works and Highways (DPWH) |
title_sort |
development of a database management system for infrastructure project planning of department of public works and highways (dpwh) |
publisher |
Animo Repository |
publishDate |
2020 |
url |
https://animorepository.dlsu.edu.ph/etd_masteral/6414 https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=13497&context=etd_masteral |
_version_ |
1746288310502817792 |