Improving imported project cargo logistics through inter-business units collaboration

The purpose of this integrative action research (IAR) is to eradicate the silo- culture of departments in any organization. As every organization aims to be effective with all its operations, inter-departments must learn to appreciate the need for synergy, collaboration and teamwork. All these are v...

Full description

Saved in:
Bibliographic Details
Main Author: Liao, Jonas Rafael E.
Format: text
Language:English
Published: Animo Repository 2019
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_masteral/6755
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_masteral-13728
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_masteral-137282023-07-12T03:12:38Z Improving imported project cargo logistics through inter-business units collaboration Liao, Jonas Rafael E. The purpose of this integrative action research (IAR) is to eradicate the silo- culture of departments in any organization. As every organization aims to be effective with all its operations, inter-departments must learn to appreciate the need for synergy, collaboration and teamwork. All these are very much needed in driving improvements and doing change management in an organization. In this IAR, objectives of instilling change, process improvements and collaboration were achieved. To make things better, all these changes gave positive impact with its costs wherein it was decreased through two (2) months’ time from the action research (AR) cycles with Construction, Planning, Action and Evaluation stages. The AR cycles were primarily guided with ADKAR change model. Then, through extrapolation, Lewin’s 3- Stage model of change was eventually utilized at is correlated with ADKAR. AR Cycle 1 covers determining the process steps that in order to resolve the non-collaboration and incremental costs concerns. AR Cycle 2 then caters the further management and recovery of the incurred incremental costs, and strengthening desire of the collaborative meetings injected in the launched process flows for the imported project cargo logistics for a manufacturing company. This action research dealt on the incremental costs in an importation process, costs that should not occur in an effective operation. These incremental costs must then be foreseen in order to prevent from happening, and be recovered in cases an organization incurred such costs already. 2019-10-19T07:00:00Z text https://animorepository.dlsu.edu.ph/etd_masteral/6755 Master's Theses English Animo Repository Interorganizational relations Business Administration, Management, and Operations
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Interorganizational relations
Business Administration, Management, and Operations
spellingShingle Interorganizational relations
Business Administration, Management, and Operations
Liao, Jonas Rafael E.
Improving imported project cargo logistics through inter-business units collaboration
description The purpose of this integrative action research (IAR) is to eradicate the silo- culture of departments in any organization. As every organization aims to be effective with all its operations, inter-departments must learn to appreciate the need for synergy, collaboration and teamwork. All these are very much needed in driving improvements and doing change management in an organization. In this IAR, objectives of instilling change, process improvements and collaboration were achieved. To make things better, all these changes gave positive impact with its costs wherein it was decreased through two (2) months’ time from the action research (AR) cycles with Construction, Planning, Action and Evaluation stages. The AR cycles were primarily guided with ADKAR change model. Then, through extrapolation, Lewin’s 3- Stage model of change was eventually utilized at is correlated with ADKAR. AR Cycle 1 covers determining the process steps that in order to resolve the non-collaboration and incremental costs concerns. AR Cycle 2 then caters the further management and recovery of the incurred incremental costs, and strengthening desire of the collaborative meetings injected in the launched process flows for the imported project cargo logistics for a manufacturing company. This action research dealt on the incremental costs in an importation process, costs that should not occur in an effective operation. These incremental costs must then be foreseen in order to prevent from happening, and be recovered in cases an organization incurred such costs already.
format text
author Liao, Jonas Rafael E.
author_facet Liao, Jonas Rafael E.
author_sort Liao, Jonas Rafael E.
title Improving imported project cargo logistics through inter-business units collaboration
title_short Improving imported project cargo logistics through inter-business units collaboration
title_full Improving imported project cargo logistics through inter-business units collaboration
title_fullStr Improving imported project cargo logistics through inter-business units collaboration
title_full_unstemmed Improving imported project cargo logistics through inter-business units collaboration
title_sort improving imported project cargo logistics through inter-business units collaboration
publisher Animo Repository
publishDate 2019
url https://animorepository.dlsu.edu.ph/etd_masteral/6755
_version_ 1772836029343989760