A feasibility study of putting up a geothermal power plant in Valencia, Negros Oriental

Our country like other developing and oil dependent nations in the world was caught by the 1973 oil crisis struggling not only for mere sustenance but also for survival. The worldwide oil crisis has thoroughly unfolded the absolute vulnerability of our country to drastic changes in the international...

Full description

Saved in:
Bibliographic Details
Main Author: Ochoa, Armando N.
Format: text
Language:English
Published: Animo Repository 1979
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_masteral/966
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_masteral-7804
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_masteral-78042021-03-24T07:32:32Z A feasibility study of putting up a geothermal power plant in Valencia, Negros Oriental Ochoa, Armando N. Our country like other developing and oil dependent nations in the world was caught by the 1973 oil crisis struggling not only for mere sustenance but also for survival. The worldwide oil crisis has thoroughly unfolded the absolute vulnerability of our country to drastic changes in the international oil market. For, as it is, the Philippines is about 95 percent dependent on imported petroleum to fuel its developmental needs. With the country's energy consumption expected to grow at the rate of 7.6 percent annually, we can foresee that by the year 2000 our total energy requirements will amount to about five times those at present. Since it is a national policy to achieve self-reliance on energy supply, the exploitation and development of locally available indigenous energy sources becomes imperative to meet the expected demand.The proposal is for the construction and subsequent operation of two (2) - 37.5 MW Geothermal Power Plant in Valencia, Negros Oriental by the National Power Corporation utilizing the steam from the wells of the Philippine National Oil Company-Energy Development Corporation as prescribed in P.D. 1442.The frequent power failures and the presence of towns without electric power indicates a big demand for power in the area. This and the presence of sugar centrals and mining industries who are depending on their own generating units could be more economically served by a power utility.Based on the initial findings of the exploratory drilling operations in the area, there is sufficient steam available to supply the steam requirements of the plant. Using conservative estimates and assumptions, the project will already attain the 8 percent required rate of return on net generating assets in only 3 years of commercial operation. The internal rate of return using discounted cash flow method will be 17 percent. The project will be generating P 27.04 Million on its initial year of commercial operation and will be able to recover the capital investment in eight years. An economic analysis with the only 1979-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_masteral/966 Master's Theses English Animo Repository Geothermal power plants Geothermal resources Power and Energy
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Geothermal power plants
Geothermal resources
Power and Energy
spellingShingle Geothermal power plants
Geothermal resources
Power and Energy
Ochoa, Armando N.
A feasibility study of putting up a geothermal power plant in Valencia, Negros Oriental
description Our country like other developing and oil dependent nations in the world was caught by the 1973 oil crisis struggling not only for mere sustenance but also for survival. The worldwide oil crisis has thoroughly unfolded the absolute vulnerability of our country to drastic changes in the international oil market. For, as it is, the Philippines is about 95 percent dependent on imported petroleum to fuel its developmental needs. With the country's energy consumption expected to grow at the rate of 7.6 percent annually, we can foresee that by the year 2000 our total energy requirements will amount to about five times those at present. Since it is a national policy to achieve self-reliance on energy supply, the exploitation and development of locally available indigenous energy sources becomes imperative to meet the expected demand.The proposal is for the construction and subsequent operation of two (2) - 37.5 MW Geothermal Power Plant in Valencia, Negros Oriental by the National Power Corporation utilizing the steam from the wells of the Philippine National Oil Company-Energy Development Corporation as prescribed in P.D. 1442.The frequent power failures and the presence of towns without electric power indicates a big demand for power in the area. This and the presence of sugar centrals and mining industries who are depending on their own generating units could be more economically served by a power utility.Based on the initial findings of the exploratory drilling operations in the area, there is sufficient steam available to supply the steam requirements of the plant. Using conservative estimates and assumptions, the project will already attain the 8 percent required rate of return on net generating assets in only 3 years of commercial operation. The internal rate of return using discounted cash flow method will be 17 percent. The project will be generating P 27.04 Million on its initial year of commercial operation and will be able to recover the capital investment in eight years. An economic analysis with the only
format text
author Ochoa, Armando N.
author_facet Ochoa, Armando N.
author_sort Ochoa, Armando N.
title A feasibility study of putting up a geothermal power plant in Valencia, Negros Oriental
title_short A feasibility study of putting up a geothermal power plant in Valencia, Negros Oriental
title_full A feasibility study of putting up a geothermal power plant in Valencia, Negros Oriental
title_fullStr A feasibility study of putting up a geothermal power plant in Valencia, Negros Oriental
title_full_unstemmed A feasibility study of putting up a geothermal power plant in Valencia, Negros Oriental
title_sort feasibility study of putting up a geothermal power plant in valencia, negros oriental
publisher Animo Repository
publishDate 1979
url https://animorepository.dlsu.edu.ph/etd_masteral/966
_version_ 1772835960093933568