A multi-period repair limit preventive maintenance model

The maintenance of a manufacturing firm's equipment is extremely important. What is the best time to replace a piece of equipment? When is the best time to perform preventive maintenance? These questions have been posed by both management and maintenance group in companies. Failure of equipment...

Full description

Saved in:
Bibliographic Details
Main Author: Cham, Hector De Guia
Format: text
Language:Others
Published: Animo Repository 1993
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_masteral/1593
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: Others
id oai:animorepository.dlsu.edu.ph:etd_masteral-8431
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_masteral-84312021-04-30T02:47:19Z A multi-period repair limit preventive maintenance model Cham, Hector De Guia The maintenance of a manufacturing firm's equipment is extremely important. What is the best time to replace a piece of equipment? When is the best time to perform preventive maintenance? These questions have been posed by both management and maintenance group in companies. Failure of equipment can happen anytime. The study makes use of a repair limit which is the basis for management's repair/replace decisions. From the literature and articles reviewed, the proponent observed that most, if not all, focused on maintenance models with equally spaced intervals. Furthermore, all available literature on maintenance models are unconstrained. This study formulates a Multi-Period Optimal Preventive Maintenance Model with the objective of minimizing total expected cost which is composed of the cost of preventive maintenance and the cost of repairs and replacements. The model considers the interval between preventive maintenance points to be unequally spaced. Moreover, the maintenance model that is developed includes a budgetary constraint and a repair limit cost parameter. This study includes the cost of preventive maintenance, failure replacements and failure repairs. The conditions for the models convexity are established and is proven through the numerical example. The study states several assumptions in the development of the model and in reality, the model may fall short of real-world application. Hence, some of these assumptions have to be relaxed in order to come up with real-world applications. However, the model in the study already provides information regarding the preventive maintenance points and the proportion of failures which could be attributed to repairs and replacements. 1993-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_masteral/1593 Master's Theses Others Animo Repository Stochastic processes Maintenance -- Equipment and supplies Repairing Mathematical theory Machinery -- Maintenance and repair xx6 Plant maintenance Industrial Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language Others
topic Stochastic processes
Maintenance -- Equipment and supplies
Repairing
Mathematical theory
Machinery -- Maintenance and repair
xx6 Plant maintenance
Industrial Engineering
spellingShingle Stochastic processes
Maintenance -- Equipment and supplies
Repairing
Mathematical theory
Machinery -- Maintenance and repair
xx6 Plant maintenance
Industrial Engineering
Cham, Hector De Guia
A multi-period repair limit preventive maintenance model
description The maintenance of a manufacturing firm's equipment is extremely important. What is the best time to replace a piece of equipment? When is the best time to perform preventive maintenance? These questions have been posed by both management and maintenance group in companies. Failure of equipment can happen anytime. The study makes use of a repair limit which is the basis for management's repair/replace decisions. From the literature and articles reviewed, the proponent observed that most, if not all, focused on maintenance models with equally spaced intervals. Furthermore, all available literature on maintenance models are unconstrained. This study formulates a Multi-Period Optimal Preventive Maintenance Model with the objective of minimizing total expected cost which is composed of the cost of preventive maintenance and the cost of repairs and replacements. The model considers the interval between preventive maintenance points to be unequally spaced. Moreover, the maintenance model that is developed includes a budgetary constraint and a repair limit cost parameter. This study includes the cost of preventive maintenance, failure replacements and failure repairs. The conditions for the models convexity are established and is proven through the numerical example. The study states several assumptions in the development of the model and in reality, the model may fall short of real-world application. Hence, some of these assumptions have to be relaxed in order to come up with real-world applications. However, the model in the study already provides information regarding the preventive maintenance points and the proportion of failures which could be attributed to repairs and replacements.
format text
author Cham, Hector De Guia
author_facet Cham, Hector De Guia
author_sort Cham, Hector De Guia
title A multi-period repair limit preventive maintenance model
title_short A multi-period repair limit preventive maintenance model
title_full A multi-period repair limit preventive maintenance model
title_fullStr A multi-period repair limit preventive maintenance model
title_full_unstemmed A multi-period repair limit preventive maintenance model
title_sort multi-period repair limit preventive maintenance model
publisher Animo Repository
publishDate 1993
url https://animorepository.dlsu.edu.ph/etd_masteral/1593
_version_ 1772835747990077440