Development of the quality plan and standard operating procedure for tower retrofitting

This paper focuses on assessing and developing the Tower Retrofitting procedure of Ericsson Telecommunications, Philippines. It is one of the leading service providers of telecommunication infrastructure in Asia. The Intern was able to identify the common problems encountered during Tower Retrofitti...

Full description

Saved in:
Bibliographic Details
Main Author: Abrazaldo, Rebeccah B.
Format: text
Language:English
Published: Animo Repository 2022
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etdm_civ/20
https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=1020&context=etdm_civ
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etdm_civ-1020
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etdm_civ-10202022-07-20T01:04:34Z Development of the quality plan and standard operating procedure for tower retrofitting Abrazaldo, Rebeccah B. This paper focuses on assessing and developing the Tower Retrofitting procedure of Ericsson Telecommunications, Philippines. It is one of the leading service providers of telecommunication infrastructure in Asia. The Intern was able to identify the common problems encountered during Tower Retrofitting implementation through the use of quality procedure techniques and checking points. As observed, these significant concerns were identified and analyzed in terms of their root cause. Control points were then established in the processes involved to minimize, if not eliminate, the recurrence of these conflicts. Upon the identification of the root cause of the problem, it was determined that there is no standard operating or quality procedure that would consistently ensure the quality and process of tower retrofitting. Thus, an efficient Tower Retrofitting flow and a detailed standard operating procedure applied to the current Tower Retrofitting system were developed. This approach involves an established flowchart for common reference and faster processing of documents aligned with the digitization of the current system due to the COVID-19 pandemic. The consistent implementation and follow-through of the proposed Tower Retrofitting Flow and Standard Operating procedures were constructed to improve the company's work quality and strengthen its clients' deliverables within the schedule and allotted budget. 2022-04-01T07:00:00Z text application/pdf https://animorepository.dlsu.edu.ph/etdm_civ/20 https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=1020&context=etdm_civ Civil Engineering Master's Theses English Animo Repository Buildings—Retrofitting Towers Civil Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Buildings—Retrofitting
Towers
Civil Engineering
spellingShingle Buildings—Retrofitting
Towers
Civil Engineering
Abrazaldo, Rebeccah B.
Development of the quality plan and standard operating procedure for tower retrofitting
description This paper focuses on assessing and developing the Tower Retrofitting procedure of Ericsson Telecommunications, Philippines. It is one of the leading service providers of telecommunication infrastructure in Asia. The Intern was able to identify the common problems encountered during Tower Retrofitting implementation through the use of quality procedure techniques and checking points. As observed, these significant concerns were identified and analyzed in terms of their root cause. Control points were then established in the processes involved to minimize, if not eliminate, the recurrence of these conflicts. Upon the identification of the root cause of the problem, it was determined that there is no standard operating or quality procedure that would consistently ensure the quality and process of tower retrofitting. Thus, an efficient Tower Retrofitting flow and a detailed standard operating procedure applied to the current Tower Retrofitting system were developed. This approach involves an established flowchart for common reference and faster processing of documents aligned with the digitization of the current system due to the COVID-19 pandemic. The consistent implementation and follow-through of the proposed Tower Retrofitting Flow and Standard Operating procedures were constructed to improve the company's work quality and strengthen its clients' deliverables within the schedule and allotted budget.
format text
author Abrazaldo, Rebeccah B.
author_facet Abrazaldo, Rebeccah B.
author_sort Abrazaldo, Rebeccah B.
title Development of the quality plan and standard operating procedure for tower retrofitting
title_short Development of the quality plan and standard operating procedure for tower retrofitting
title_full Development of the quality plan and standard operating procedure for tower retrofitting
title_fullStr Development of the quality plan and standard operating procedure for tower retrofitting
title_full_unstemmed Development of the quality plan and standard operating procedure for tower retrofitting
title_sort development of the quality plan and standard operating procedure for tower retrofitting
publisher Animo Repository
publishDate 2022
url https://animorepository.dlsu.edu.ph/etdm_civ/20
https://animorepository.dlsu.edu.ph/cgi/viewcontent.cgi?article=1020&context=etdm_civ
_version_ 1738854828804669440