Modeling road construction project cost in the Philippines using the artificial neural network approach

Incomplete data and several unforeseen factors affect the accuracy of project cost estimates, especially during the conceptualization stage. When stakeholders need an immediate estimate of the budget for a project, in-depth cost analysis may take time, sacrificing resources for feasibility studies....

Full description

Saved in:
Bibliographic Details
Main Authors: Roxas, Cheryl Lyne C., Roxas, Nicanor R., Cristobal, Jerald, Hao, Sara Eunice, Rabino, Rachelle Marie G., Revalde, Fulgencio
Format: text
Published: Animo Repository 2019
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/faculty_research/147
https://animorepository.dlsu.edu.ph/context/faculty_research/article/1146/type/native/viewcontent
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Description
Summary:Incomplete data and several unforeseen factors affect the accuracy of project cost estimates, especially during the conceptualization stage. When stakeholders need an immediate estimate of the budget for a project, in-depth cost analysis may take time, sacrificing resources for feasibility studies. In the Philippines, a more effective and efficient early cost estimation method is recommended to ensure proper utilization of government funds. In this paper, the artificial neural network technique was adopted to model the local total road project cost. Data collection included 41 road projects with each having 15 factors were recorded, namely: road type, location (region), length of road, duration of project, capacity, pavement thickness, pavement width, shoulder width, earthworks volume, average site clearing/grubbing area, presence of water body, soil conditions, surface class, gross domestic product and consumer price index. After correlation analysis, 7 input variables were finalized. These are the soil condition, surface class, gross domestic product, presence of water body, pavement width, road type and capacity. Several simulations were performed in MATLAB software to determine the best total road project cost model. The best neural network architecture consists of 7 input variables, 12 neurons in the hidden layer and 1 output variable. This neural network model satisfactorily predicted the total cost with coefficient of correlation values of 0.97168, 0.95188, and 0.99036 for training, validation and testing phases, respectively.