A heuristic for minimizing total weighted tardiness in the two-machine flowshop problem when jobs have processing times min(P1) > max(P2)
Saved in:
Main Author: | |
---|---|
Format: | text |
Published: |
Animo Repository
2006
|
Online Access: | https://animorepository.dlsu.edu.ph/faculty_research/10082 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |