Cost overruns and the proposed Panay-Guimaras-Negros inter-island bridge project, Philippines

Studies have shown that mega transportation infrastructure projects underperform when actual cost and benefits are compared to forecasts utilized in the project proposals. The projected costs have been shown to be commonly underestimated. In this research, a database of transportation projects from...

Full description

Saved in:
Bibliographic Details
Main Authors: Roxas, Nicanor R., Jr., Fillone, Alexis M., Chalermpong, Saksith
Format: text
Published: Animo Repository 2015
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/faculty_research/11377
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
id oai:animorepository.dlsu.edu.ph:faculty_research-13367
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:faculty_research-133672023-12-05T08:20:22Z Cost overruns and the proposed Panay-Guimaras-Negros inter-island bridge project, Philippines Roxas, Nicanor R., Jr. Fillone, Alexis M. Chalermpong, Saksith Studies have shown that mega transportation infrastructure projects underperform when actual cost and benefits are compared to forecasts utilized in the project proposals. The projected costs have been shown to be commonly underestimated. In this research, a database of transportation projects from the Philippines was assembled to look into the distribution of cost forecast inaccuracies. An ambitious project in the Western Visayas Region is assessed. The Panay-Guimaras-Negros (PGN) Bridge Project intends to connect Panay, Guimaras, and Negros islands via inter-island bridges that span approximately 23 km. In this study, the PGN project is contrasted against previously completed projects and lessons drawn from their experience. Moreover, the Reference Class Forecasting (RCF), as devised by Flyvbjerg, is tackled to improve risk assessment in transportation infrastructure project proposals. if the proposed PGN proposal were placed in the distribution of completed projects based on the databases established, 23% to 55% cost escalation is to be expected when considering 20% risk of cost overrun. This translates to 25% to approximately 33% allotment from the total national public works budget to the proposal. Since the Philippines does not have the recipe for success for this kind of project , caution should be exercised in handling this proposal. 2015-06-01T07:00:00Z text https://animorepository.dlsu.edu.ph/faculty_research/11377 Faculty Research Work Animo Repository Public works--Evaluation Bridges—Design and construction--Philippines Construction projects--Philippines—Evaluation Construction projects--Philippines—Cost effectiveness Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
topic Public works--Evaluation
Bridges—Design and construction--Philippines
Construction projects--Philippines—Evaluation
Construction projects--Philippines—Cost effectiveness
Engineering
spellingShingle Public works--Evaluation
Bridges—Design and construction--Philippines
Construction projects--Philippines—Evaluation
Construction projects--Philippines—Cost effectiveness
Engineering
Roxas, Nicanor R., Jr.
Fillone, Alexis M.
Chalermpong, Saksith
Cost overruns and the proposed Panay-Guimaras-Negros inter-island bridge project, Philippines
description Studies have shown that mega transportation infrastructure projects underperform when actual cost and benefits are compared to forecasts utilized in the project proposals. The projected costs have been shown to be commonly underestimated. In this research, a database of transportation projects from the Philippines was assembled to look into the distribution of cost forecast inaccuracies. An ambitious project in the Western Visayas Region is assessed. The Panay-Guimaras-Negros (PGN) Bridge Project intends to connect Panay, Guimaras, and Negros islands via inter-island bridges that span approximately 23 km. In this study, the PGN project is contrasted against previously completed projects and lessons drawn from their experience. Moreover, the Reference Class Forecasting (RCF), as devised by Flyvbjerg, is tackled to improve risk assessment in transportation infrastructure project proposals. if the proposed PGN proposal were placed in the distribution of completed projects based on the databases established, 23% to 55% cost escalation is to be expected when considering 20% risk of cost overrun. This translates to 25% to approximately 33% allotment from the total national public works budget to the proposal. Since the Philippines does not have the recipe for success for this kind of project , caution should be exercised in handling this proposal.
format text
author Roxas, Nicanor R., Jr.
Fillone, Alexis M.
Chalermpong, Saksith
author_facet Roxas, Nicanor R., Jr.
Fillone, Alexis M.
Chalermpong, Saksith
author_sort Roxas, Nicanor R., Jr.
title Cost overruns and the proposed Panay-Guimaras-Negros inter-island bridge project, Philippines
title_short Cost overruns and the proposed Panay-Guimaras-Negros inter-island bridge project, Philippines
title_full Cost overruns and the proposed Panay-Guimaras-Negros inter-island bridge project, Philippines
title_fullStr Cost overruns and the proposed Panay-Guimaras-Negros inter-island bridge project, Philippines
title_full_unstemmed Cost overruns and the proposed Panay-Guimaras-Negros inter-island bridge project, Philippines
title_sort cost overruns and the proposed panay-guimaras-negros inter-island bridge project, philippines
publisher Animo Repository
publishDate 2015
url https://animorepository.dlsu.edu.ph/faculty_research/11377
_version_ 1784863540349239296