Assessment of time and costs of two formwork methodologies in the Philippines using BIM simulation

In the Philippine construction industry, choices of formwork methodology is critical to contractors or client/project managers. Cost and time are the parameters commonly considered to address which method is recommended for a project. In this study, simulation using BIM was made from input parameter...

Full description

Saved in:
Bibliographic Details
Main Author: Ongpeng, Jason Maximino C.
Format: text
Published: Animo Repository 2018
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/faculty_research/2405
https://animorepository.dlsu.edu.ph/context/faculty_research/article/3404/type/native/viewcontent
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
id oai:animorepository.dlsu.edu.ph:faculty_research-3404
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:faculty_research-34042021-08-26T06:26:05Z Assessment of time and costs of two formwork methodologies in the Philippines using BIM simulation Ongpeng, Jason Maximino C. In the Philippine construction industry, choices of formwork methodology is critical to contractors or client/project managers. Cost and time are the parameters commonly considered to address which method is recommended for a project. In this study, simulation using BIM was made from input parameters taken from actual project observations and data collection from five projects. Two methods were considered: method A (traditional forms) and method B (steel decks). The output parameters after the BIM simulation were processed cost and time. A statistical t-test was conducted for both process costs and time durations to differentiate between the two methods. It was found out that the process costs for overall, columns, and beams of method A were not statistically different from method B, while the slab process cost was significantly different. This indicated that only slab process cost was relatively expensive for method B. For the duration, both the columns and beams were not statistically different, while overall and slabs' duration was significantly different. It showed that overall duration and slab process duration is relatively lower for method B. This paper showed that BIM simulation could help managers in their decision on choosing the construction methodology to balance cost and time of their project. © International Journal on Advanced Science, Engineering and Information Technology. 2018-01-01T08:00:00Z text text/html https://animorepository.dlsu.edu.ph/faculty_research/2405 https://animorepository.dlsu.edu.ph/context/faculty_research/article/3404/type/native/viewcontent Faculty Research Work Animo Repository Building information modeling Concrete construction—Formwork Civil Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
topic Building information modeling
Concrete construction—Formwork
Civil Engineering
spellingShingle Building information modeling
Concrete construction—Formwork
Civil Engineering
Ongpeng, Jason Maximino C.
Assessment of time and costs of two formwork methodologies in the Philippines using BIM simulation
description In the Philippine construction industry, choices of formwork methodology is critical to contractors or client/project managers. Cost and time are the parameters commonly considered to address which method is recommended for a project. In this study, simulation using BIM was made from input parameters taken from actual project observations and data collection from five projects. Two methods were considered: method A (traditional forms) and method B (steel decks). The output parameters after the BIM simulation were processed cost and time. A statistical t-test was conducted for both process costs and time durations to differentiate between the two methods. It was found out that the process costs for overall, columns, and beams of method A were not statistically different from method B, while the slab process cost was significantly different. This indicated that only slab process cost was relatively expensive for method B. For the duration, both the columns and beams were not statistically different, while overall and slabs' duration was significantly different. It showed that overall duration and slab process duration is relatively lower for method B. This paper showed that BIM simulation could help managers in their decision on choosing the construction methodology to balance cost and time of their project. © International Journal on Advanced Science, Engineering and Information Technology.
format text
author Ongpeng, Jason Maximino C.
author_facet Ongpeng, Jason Maximino C.
author_sort Ongpeng, Jason Maximino C.
title Assessment of time and costs of two formwork methodologies in the Philippines using BIM simulation
title_short Assessment of time and costs of two formwork methodologies in the Philippines using BIM simulation
title_full Assessment of time and costs of two formwork methodologies in the Philippines using BIM simulation
title_fullStr Assessment of time and costs of two formwork methodologies in the Philippines using BIM simulation
title_full_unstemmed Assessment of time and costs of two formwork methodologies in the Philippines using BIM simulation
title_sort assessment of time and costs of two formwork methodologies in the philippines using bim simulation
publisher Animo Repository
publishDate 2018
url https://animorepository.dlsu.edu.ph/faculty_research/2405
https://animorepository.dlsu.edu.ph/context/faculty_research/article/3404/type/native/viewcontent
_version_ 1709757509977243648