Paths combination for HENs retrofit

With the significant increase in fuel price, energy conservation projects should be reviewed and analyzed properly. Retrofit of heat exchanger networks (HENs) is among the common projects to reduce the plant operational cost. This paper introduced a new procedure using the path analysis approach for...

Full description

Saved in:
Bibliographic Details
Main Authors: A., Osman, M.I., Abdul Mutalib, M., Shuhaimi, K.A., Amminudin
Format: Article
Language:English
Published: 2009
Subjects:
Online Access:http://scholars.utp.edu.my/id/eprint/585/1/paper.pdf
http://scholars.utp.edu.my/id/eprint/585/
http://www.scopus.com/inward/record.url?eid=2-s2.0-67651111860&partnerID=40&md5=6bc33fd0af8936fc7058cae3b0e8eb2f
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
Language: English
Description
Summary:With the significant increase in fuel price, energy conservation projects should be reviewed and analyzed properly. Retrofit of heat exchanger networks (HENs) is among the common projects to reduce the plant operational cost. This paper introduced a new procedure using the path analysis approach for HEN retrofit. The developed procedure attempts at generating options for retrofit solution. These options are created by combining the available utility paths in HEN systematically. Instead of relying on a single path, the heat load could be shifted from HEN utilities using a set of paths simultaneously. To ensure feasible heat transfer between the hot and cold streams throughout, Exchanger Minimum Approach Temperature (EMAT) is maintained while shifting the heat load. The available exchangers' pressure drop is considered in calculating the heat transfer coefficients. HEN devices are subjected to some additional area without any topological modification. In addition, the investment of such area could be recovered in a short span of time. The calculation of this approach encountered some iteration which has been overcome by mathematical programming. Demonstration example showed some options to be reasonable retrofit solutions. Energy savings ranged between $150 K and $450 K per year with payback time of less than 2 years were possible. © 2009 Elsevier Ltd. All rights reserved.