PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD

Traditionally the prediction of total project cost and schedule/time followed different methods. The former was based on the schedule of quantities and labors and the latter on quantity of work and productivity. The major deficiency of the methods was that the calculations were independent. Chang...

Full description

Saved in:
Bibliographic Details
Main Author: PHUOR , TY
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://utpedia.utp.edu.my/id/eprint/21182/1/2014-CIVIL-PREDICTION%20OF%20THE%20TOTAL%20COST%20AND%20MONITORING%20AND%20CONTROL%20OF%20OFFSHORE%20PIPEWORK%20PROJECT%20USING%20THE%20INTERGRATED%20MATHEMATICAL%20MATRIX%20METHOD-PHUOR%20TY.pdf
http://utpedia.utp.edu.my/id/eprint/21182/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Petronas
Language: English
id oai:utpedia.utp.edu.my:21182
record_format eprints
spelling oai:utpedia.utp.edu.my:211822024-07-24T06:13:55Z http://utpedia.utp.edu.my/id/eprint/21182/ PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD PHUOR , TY TA Engineering (General). Civil engineering (General) Traditionally the prediction of total project cost and schedule/time followed different methods. The former was based on the schedule of quantities and labors and the latter on quantity of work and productivity. The major deficiency of the methods was that the calculations were independent. Changes in schedule were not reflected in cost and vice versa, i.e. the methods were not integrated. Many researches have been carried out on the integration of cost and schedule to provide consistency in the evaluation of cost and schedule. Changes in schedule automatically reflected on the cost of the project. The integration of cost and schedule requires project management breakdown structure, project breakdown structure, agreed schedule and resources. The models developed by Lee and Yi (1999) and Chen (2008) were robust but did not include all the factors. The integrated technique has also not been applied to offshore projects. The nature of offshore projects and difficulties in developing the project breakdown structure were the main challenges. 2015-06 Thesis NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/id/eprint/21182/1/2014-CIVIL-PREDICTION%20OF%20THE%20TOTAL%20COST%20AND%20MONITORING%20AND%20CONTROL%20OF%20OFFSHORE%20PIPEWORK%20PROJECT%20USING%20THE%20INTERGRATED%20MATHEMATICAL%20MATRIX%20METHOD-PHUOR%20TY.pdf PHUOR , TY (2015) PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD. Masters thesis, Universiti Teknologi PETRONAS.
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
PHUOR , TY
PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD
description Traditionally the prediction of total project cost and schedule/time followed different methods. The former was based on the schedule of quantities and labors and the latter on quantity of work and productivity. The major deficiency of the methods was that the calculations were independent. Changes in schedule were not reflected in cost and vice versa, i.e. the methods were not integrated. Many researches have been carried out on the integration of cost and schedule to provide consistency in the evaluation of cost and schedule. Changes in schedule automatically reflected on the cost of the project. The integration of cost and schedule requires project management breakdown structure, project breakdown structure, agreed schedule and resources. The models developed by Lee and Yi (1999) and Chen (2008) were robust but did not include all the factors. The integrated technique has also not been applied to offshore projects. The nature of offshore projects and difficulties in developing the project breakdown structure were the main challenges.
format Thesis
author PHUOR , TY
author_facet PHUOR , TY
author_sort PHUOR , TY
title PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD
title_short PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD
title_full PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD
title_fullStr PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD
title_full_unstemmed PREDICTION OF THE TOTAL COST AND MONITORING AND CONTROL OF OFFSHORE PIPEWORK PROJECT USING THE INTEGRATED MATHEMATICAL MATRLX METHOD
title_sort prediction of the total cost and monitoring and control of offshore pipework project using the integrated mathematical matrlx method
publishDate 2015
url http://utpedia.utp.edu.my/id/eprint/21182/1/2014-CIVIL-PREDICTION%20OF%20THE%20TOTAL%20COST%20AND%20MONITORING%20AND%20CONTROL%20OF%20OFFSHORE%20PIPEWORK%20PROJECT%20USING%20THE%20INTERGRATED%20MATHEMATICAL%20MATRIX%20METHOD-PHUOR%20TY.pdf
http://utpedia.utp.edu.my/id/eprint/21182/
_version_ 1805891019181391872