Examining the implementation of PBB scheme in the public sector
In 2012, through Executive Order 80, s. 2012, the government adopted a Performance-Based Incentive System (PBIS) for employees in the public sector to reward exemplary performance, align individual personnel and departmental efforts with organizational targets, and improve service delivery. The PBIS...
Saved in:
Main Authors: | Albert, Jose Ramon G, Mendoza, Ronald U, Cuenca, Janet S, Muñoz, Mika S |
---|---|
Format: | text |
Published: |
Archīum Ateneo
2020
|
Subjects: | |
Online Access: | https://archium.ateneo.edu/asog-pubs/175 https://think-asia.org/handle/11540/11551 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Ateneo De Manila University |
Similar Items
-
On Philippine wage structures: Assessing the empirical value of parametric and nonparametric wage functions
by: Dacuycuy, Lawrence B., et al.
Published: (2011) -
Competency-based compensation and equitable profit sharing
by: Manalo, R. G., et al.
Published: (2010) -
Is the earnings-schooling relationship linear? A semiparametic analysis
by: Dacuycuy, Lawrence B.
Published: (2005) -
The basis of wage determination in the manufacturing sector: Its implications on wage discrimination across gender
by: Del Rosario, Cheryl Mae, et al.
Published: (1995) -
The unemployment effects of minimum wage legislation on the manufacturing industry
by: Abrenica, Ma. Joy, et al.
Published: (1985)