An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines
Rural electrification in the Philippines is one of the main problems in the country. In this study, the possible electrification of Barangay Puray using three alternatives, namely, solar power, generator set and Meralco connection was analyzed. The stakeholders in this study were the people of the b...
Saved in:
Main Authors: | , , |
---|---|
Format: | text |
Published: |
Archīum Ateneo
2022
|
Subjects: | |
Online Access: | https://archium.ateneo.edu/physics-faculty-pubs/128 https://archium.ateneo.edu/cgi/viewcontent.cgi?article=1127&context=physics-faculty-pubs |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Ateneo De Manila University |
id |
ph-ateneo-arc.physics-faculty-pubs-1127 |
---|---|
record_format |
eprints |
spelling |
ph-ateneo-arc.physics-faculty-pubs-11272023-02-20T02:53:54Z An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines Olalo, Joselito Dela Cruz, Catherine Joy Generoso, Krizzia Rural electrification in the Philippines is one of the main problems in the country. In this study, the possible electrification of Barangay Puray using three alternatives, namely, solar power, generator set and Meralco connection was analyzed. The stakeholders in this study were the people of the barangay, the local government of Rizal and the Meralco Corporation. Some assumptions are made, one of which is that the local government of Rizal will pay the capital costs for solar power and generator set, while the residents of the barangay will pay the government within 25-year period of the study. Here, two cases were introduced, whether the residents will pay the capital and maintenance costs or the maintenance costs only. The values of the initial costs and maintenance costs were compared and used to get the generation cost of the system. The results showed different values, with total of 189,889,720 pesos for the solar power while for the generator set was 235,425,304 pesos, thus the conclusion was made for the perspective of each of the stakeholder. For the residents of Barangay Puray, the most feasible was the solar power utility system. For the local government of Rizal, the generator set was more advantageous. While the Meralco Corporation would need the road laid out first before the electrification even it only has capital cost of 10,721,984 pesos in which the MOE was disregarded. 2022-01-01T08:00:00Z text application/pdf https://archium.ateneo.edu/physics-faculty-pubs/128 https://archium.ateneo.edu/cgi/viewcontent.cgi?article=1127&context=physics-faculty-pubs Physics Faculty Publications Archīum Ateneo Rural electrification Solar panel utility system Generator system On-grid Off-grid connection |
institution |
Ateneo De Manila University |
building |
Ateneo De Manila University Library |
continent |
Asia |
country |
Philippines Philippines |
content_provider |
Ateneo De Manila University Library |
collection |
archium.Ateneo Institutional Repository |
topic |
Rural electrification Solar panel utility system Generator system On-grid Off-grid connection |
spellingShingle |
Rural electrification Solar panel utility system Generator system On-grid Off-grid connection Olalo, Joselito Dela Cruz, Catherine Joy Generoso, Krizzia An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines |
description |
Rural electrification in the Philippines is one of the main problems in the country. In this study, the possible electrification of Barangay Puray using three alternatives, namely, solar power, generator set and Meralco connection was analyzed. The stakeholders in this study were the people of the barangay, the local government of Rizal and the Meralco Corporation. Some assumptions are made, one of which is that the local government of Rizal will pay the capital costs for solar power and generator set, while the residents of the barangay will pay the government within 25-year period of the study. Here, two cases were introduced, whether the residents will pay the capital and maintenance costs or the maintenance costs only. The values of the initial costs and maintenance costs were compared and used to get the generation cost of the system. The results showed different values, with total of 189,889,720 pesos for the solar power while for the generator set was 235,425,304 pesos, thus the conclusion was made for the perspective of each of the stakeholder. For the residents of Barangay Puray, the most feasible was the solar power utility system. For the local government of Rizal, the generator set was more advantageous. While the Meralco Corporation would need the road laid out first before the electrification even it only has capital cost of 10,721,984 pesos in which the MOE was disregarded. |
format |
text |
author |
Olalo, Joselito Dela Cruz, Catherine Joy Generoso, Krizzia |
author_facet |
Olalo, Joselito Dela Cruz, Catherine Joy Generoso, Krizzia |
author_sort |
Olalo, Joselito |
title |
An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines |
title_short |
An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines |
title_full |
An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines |
title_fullStr |
An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines |
title_full_unstemmed |
An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines |
title_sort |
energy system evaluation of rural electrification of barangay puray, rodriguez, rizal, philippines |
publisher |
Archīum Ateneo |
publishDate |
2022 |
url |
https://archium.ateneo.edu/physics-faculty-pubs/128 https://archium.ateneo.edu/cgi/viewcontent.cgi?article=1127&context=physics-faculty-pubs |
_version_ |
1759060141664108544 |