An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines

Rural electrification in the Philippines is one of the main problems in the country. In this study, the possible electrification of Barangay Puray using three alternatives, namely, solar power, generator set and Meralco connection was analyzed. The stakeholders in this study were the people of the b...

Full description

Saved in:
Bibliographic Details
Main Authors: Olalo, Joselito, Dela Cruz, Catherine Joy, Generoso, Krizzia
Format: text
Published: Archīum Ateneo 2022
Subjects:
Online Access:https://archium.ateneo.edu/physics-faculty-pubs/128
https://archium.ateneo.edu/cgi/viewcontent.cgi?article=1127&context=physics-faculty-pubs
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Ateneo De Manila University
id ph-ateneo-arc.physics-faculty-pubs-1127
record_format eprints
spelling ph-ateneo-arc.physics-faculty-pubs-11272023-02-20T02:53:54Z An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines Olalo, Joselito Dela Cruz, Catherine Joy Generoso, Krizzia Rural electrification in the Philippines is one of the main problems in the country. In this study, the possible electrification of Barangay Puray using three alternatives, namely, solar power, generator set and Meralco connection was analyzed. The stakeholders in this study were the people of the barangay, the local government of Rizal and the Meralco Corporation. Some assumptions are made, one of which is that the local government of Rizal will pay the capital costs for solar power and generator set, while the residents of the barangay will pay the government within 25-year period of the study. Here, two cases were introduced, whether the residents will pay the capital and maintenance costs or the maintenance costs only. The values of the initial costs and maintenance costs were compared and used to get the generation cost of the system. The results showed different values, with total of 189,889,720 pesos for the solar power while for the generator set was 235,425,304 pesos, thus the conclusion was made for the perspective of each of the stakeholder. For the residents of Barangay Puray, the most feasible was the solar power utility system. For the local government of Rizal, the generator set was more advantageous. While the Meralco Corporation would need the road laid out first before the electrification even it only has capital cost of 10,721,984 pesos in which the MOE was disregarded. 2022-01-01T08:00:00Z text application/pdf https://archium.ateneo.edu/physics-faculty-pubs/128 https://archium.ateneo.edu/cgi/viewcontent.cgi?article=1127&context=physics-faculty-pubs Physics Faculty Publications Archīum Ateneo Rural electrification Solar panel utility system Generator system On-grid Off-grid connection
institution Ateneo De Manila University
building Ateneo De Manila University Library
continent Asia
country Philippines
Philippines
content_provider Ateneo De Manila University Library
collection archium.Ateneo Institutional Repository
topic Rural electrification
Solar panel utility system
Generator system
On-grid
Off-grid connection
spellingShingle Rural electrification
Solar panel utility system
Generator system
On-grid
Off-grid connection
Olalo, Joselito
Dela Cruz, Catherine Joy
Generoso, Krizzia
An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines
description Rural electrification in the Philippines is one of the main problems in the country. In this study, the possible electrification of Barangay Puray using three alternatives, namely, solar power, generator set and Meralco connection was analyzed. The stakeholders in this study were the people of the barangay, the local government of Rizal and the Meralco Corporation. Some assumptions are made, one of which is that the local government of Rizal will pay the capital costs for solar power and generator set, while the residents of the barangay will pay the government within 25-year period of the study. Here, two cases were introduced, whether the residents will pay the capital and maintenance costs or the maintenance costs only. The values of the initial costs and maintenance costs were compared and used to get the generation cost of the system. The results showed different values, with total of 189,889,720 pesos for the solar power while for the generator set was 235,425,304 pesos, thus the conclusion was made for the perspective of each of the stakeholder. For the residents of Barangay Puray, the most feasible was the solar power utility system. For the local government of Rizal, the generator set was more advantageous. While the Meralco Corporation would need the road laid out first before the electrification even it only has capital cost of 10,721,984 pesos in which the MOE was disregarded.
format text
author Olalo, Joselito
Dela Cruz, Catherine Joy
Generoso, Krizzia
author_facet Olalo, Joselito
Dela Cruz, Catherine Joy
Generoso, Krizzia
author_sort Olalo, Joselito
title An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines
title_short An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines
title_full An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines
title_fullStr An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines
title_full_unstemmed An Energy System Evaluation of Rural Electrification of Barangay Puray, Rodriguez, Rizal, Philippines
title_sort energy system evaluation of rural electrification of barangay puray, rodriguez, rizal, philippines
publisher Archīum Ateneo
publishDate 2022
url https://archium.ateneo.edu/physics-faculty-pubs/128
https://archium.ateneo.edu/cgi/viewcontent.cgi?article=1127&context=physics-faculty-pubs
_version_ 1759060141664108544