Reliability evaluation of power systems considering restructuring and renewable generators
In the current power systems, some new problems have emerged regarding system reliability management due to system restructuring and the addition of renewable power generators. Because of intermittent and uncertain behaviors of renewable sources, and separation of generation system into different co...
Saved in:
Main Authors: | Mehrtash, Amir, Wang, Peng, Goel, Lalit |
---|---|
Other Authors: | School of Electrical and Electronic Engineering |
Format: | Article |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/100630 http://hdl.handle.net/10220/16512 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Reliability considerations in restructured power systems with wind generation
by: Mehrtash, Amir.
Published: (2013) -
Reliability assessment of restructured power systems using optimal load shedding technique
by: Wang, Peng, et al.
Published: (2011) -
Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques
by: Ding, Yi, et al.
Published: (2011) -
Dynamic reliability assessment for bilateral contract electricity providers in restructured power systems
by: Ding, Yi, et al.
Published: (2011) -
Short-term and medium-term reliability evaluation for power systems with high penetration of wind power
by: Wang, Peng, et al.
Published: (2014)