Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme
A battery energy storage scheme to enable short-term dispatch commitment from a grid-connected wind-turbine generating power station is considered. Among the various types of energy storage medium, technical factors leading to the selection of battery are explained. The scheme utilizes two battery e...
Saved in:
Main Authors: | , , , |
---|---|
Other Authors: | |
Format: | Article |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/102003 http://hdl.handle.net/10220/16500 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-102003 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-1020032020-03-07T14:00:35Z Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme Yao, D. L. Lie, T. T. Choi, San Shing Tseng, King Jet School of Electrical and Electronic Engineering Centre for Smart Energy Systems DRNTU::Engineering::Computer science and engineering::Information systems::Information storage and retrieval A battery energy storage scheme to enable short-term dispatch commitment from a grid-connected wind-turbine generating power station is considered. Among the various types of energy storage medium, technical factors leading to the selection of battery are explained. The scheme utilizes two battery energy storage systems (BESS) in which the generated wind power charges one BESS while concurrently, the second BESS is to discharge power into the grid. The role of the two BESS interchanges when the BESS reaches specified state of charge/discharge. Furthermore, based on forecasted charging wind power and the monitored states of charge of the two BESS, the discharge power level from the generating station is determined and scheduled a few hours ahead. The dispatch scheme maximizes wind energy harnessed, achieved with the minimum number of the BESS switch-overs. The design thus prolongs the service life of the BESS. Numerical examples to demonstrate the performance of the scheme are also included. 2013-10-16T01:52:45Z 2019-12-06T20:48:14Z 2013-10-16T01:52:45Z 2019-12-06T20:48:14Z 2012 2012 Journal Article Yao, D. L., Choi, S. S., Tseng, K. J., & Lie, J. J. (2012). Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme. IEEE transactions on sustainable energy, 3(1), 74-84. https://hdl.handle.net/10356/102003 http://hdl.handle.net/10220/16500 10.1109/TSTE.2011.2163092 en IEEE transactions on sustainable energy |
institution |
Nanyang Technological University |
building |
NTU Library |
country |
Singapore |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Computer science and engineering::Information systems::Information storage and retrieval |
spellingShingle |
DRNTU::Engineering::Computer science and engineering::Information systems::Information storage and retrieval Yao, D. L. Lie, T. T. Choi, San Shing Tseng, King Jet Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme |
description |
A battery energy storage scheme to enable short-term dispatch commitment from a grid-connected wind-turbine generating power station is considered. Among the various types of energy storage medium, technical factors leading to the selection of battery are explained. The scheme utilizes two battery energy storage systems (BESS) in which the generated wind power charges one BESS while concurrently, the second BESS is to discharge power into the grid. The role of the two BESS interchanges when the BESS reaches specified state of charge/discharge. Furthermore, based on forecasted charging wind power and the monitored states of charge of the two BESS, the discharge power level from the generating station is determined and scheduled a few hours ahead. The dispatch scheme maximizes wind energy harnessed, achieved with the minimum number of the BESS switch-overs. The design thus prolongs the service life of the BESS. Numerical examples to demonstrate the performance of the scheme are also included. |
author2 |
School of Electrical and Electronic Engineering |
author_facet |
School of Electrical and Electronic Engineering Yao, D. L. Lie, T. T. Choi, San Shing Tseng, King Jet |
format |
Article |
author |
Yao, D. L. Lie, T. T. Choi, San Shing Tseng, King Jet |
author_sort |
Yao, D. L. |
title |
Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme |
title_short |
Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme |
title_full |
Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme |
title_fullStr |
Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme |
title_full_unstemmed |
Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme |
title_sort |
determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme |
publishDate |
2013 |
url |
https://hdl.handle.net/10356/102003 http://hdl.handle.net/10220/16500 |
_version_ |
1681036722584944640 |