A hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing

This article presents an efficient Hybrid Discrete Differential Evolution (HDDE) model to solve the Economic Lot Scheduling Problem (ELSP) using a time variant lot sizing approach. This proposed method introduces a novel Greedy Reordering Local Search (GRLS) operator as well as a novel Discrete DE s...

Full description

Saved in:
Bibliographic Details
Main Authors: Suganthan, P. N., Ganguly, Srinjoy, Chowdhury, Arkabandhu, Mukherjee, Swahum, Das, Swagatam, Chua, Tay Jin
Other Authors: School of Electrical and Electronic Engineering
Format: Conference or Workshop Item
Language:English
Published: 2013
Online Access:https://hdl.handle.net/10356/104626
http://hdl.handle.net/10220/18248
http://link.springer.com.ezlibproxy1.ntu.edu.sg/chapter/10.1007%2F978-3-642-32922-7_1#
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-104626
record_format dspace
spelling sg-ntu-dr.10356-1046262019-12-06T21:36:29Z A hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing Suganthan, P. N. Ganguly, Srinjoy Chowdhury, Arkabandhu Mukherjee, Swahum Das, Swagatam Chua, Tay Jin School of Electrical and Electronic Engineering International Conference on Soft Computing Models in Industrial and Environmental Applications (7th : 2012 : Ostrava, Czech) A*STAR SIMTech This article presents an efficient Hybrid Discrete Differential Evolution (HDDE) model to solve the Economic Lot Scheduling Problem (ELSP) using a time variant lot sizing approach. This proposed method introduces a novel Greedy Reordering Local Search (GRLS) operator as well as a novel Discrete DE scheme for solving the problem. The economic lot-scheduling problem (ELSP) is an important production scheduling problem that has been intensively studied. In this problem, several products compete for the use of a single machine, which is very similar to the real-life industrial scenario, in particular in the field of remanufacturing. The experimental results indicate that the proposed algorithm outperforms several previously used heuristic algorithms under the time-varying lot sizing approach. 2013-12-16T03:53:35Z 2019-12-06T21:36:29Z 2013-12-16T03:53:35Z 2019-12-06T21:36:29Z 2013 2013 Conference Paper Ganguly S., Chowdhury A., Mukherjee S., Suganthan P.N., Das S., & Chua T.J. (2013). A Hybrid Discrete Differential Evolution Algorithm for Economic Lot Scheduling Problem with Time Variant Lot Sizing. 7th International Conference, SOCO’12, 188, 1-12. https://hdl.handle.net/10356/104626 http://hdl.handle.net/10220/18248 http://link.springer.com.ezlibproxy1.ntu.edu.sg/chapter/10.1007%2F978-3-642-32922-7_1# en
institution Nanyang Technological University
building NTU Library
country Singapore
collection DR-NTU
language English
description This article presents an efficient Hybrid Discrete Differential Evolution (HDDE) model to solve the Economic Lot Scheduling Problem (ELSP) using a time variant lot sizing approach. This proposed method introduces a novel Greedy Reordering Local Search (GRLS) operator as well as a novel Discrete DE scheme for solving the problem. The economic lot-scheduling problem (ELSP) is an important production scheduling problem that has been intensively studied. In this problem, several products compete for the use of a single machine, which is very similar to the real-life industrial scenario, in particular in the field of remanufacturing. The experimental results indicate that the proposed algorithm outperforms several previously used heuristic algorithms under the time-varying lot sizing approach.
author2 School of Electrical and Electronic Engineering
author_facet School of Electrical and Electronic Engineering
Suganthan, P. N.
Ganguly, Srinjoy
Chowdhury, Arkabandhu
Mukherjee, Swahum
Das, Swagatam
Chua, Tay Jin
format Conference or Workshop Item
author Suganthan, P. N.
Ganguly, Srinjoy
Chowdhury, Arkabandhu
Mukherjee, Swahum
Das, Swagatam
Chua, Tay Jin
spellingShingle Suganthan, P. N.
Ganguly, Srinjoy
Chowdhury, Arkabandhu
Mukherjee, Swahum
Das, Swagatam
Chua, Tay Jin
A hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing
author_sort Suganthan, P. N.
title A hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing
title_short A hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing
title_full A hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing
title_fullStr A hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing
title_full_unstemmed A hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing
title_sort hybrid discrete differential evolution algorithm for economic lot scheduling problem with time variant lot sizing
publishDate 2013
url https://hdl.handle.net/10356/104626
http://hdl.handle.net/10220/18248
http://link.springer.com.ezlibproxy1.ntu.edu.sg/chapter/10.1007%2F978-3-642-32922-7_1#
_version_ 1681048023558258688