Developing an access-based decision support system for scheduling of NBS teaching staff.
This project deals with the development of a systematic algorithm and a decision support system for staff scheduling. We aim to design a compact schedule for all the instructors, by the use of an allocation heuristic that seeks to minimise the variances among assigned time slots.We have developed a...
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Final Year Project |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/11136 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Summary: | This project deals with the development of a systematic algorithm and a decision support system for staff scheduling. We aim to design a compact schedule for all the instructors, by the use of an allocation heuristic that seeks to minimise the variances among assigned time slots.We have developed a full PC-Based package in Visual Basic 5.0 environment. We have come up with the full complete procedure for anther approach but it has not been coded into our system. It is hoped that future ARP groups can possibly undertake this work. |
---|