Forecasting lumpy demand created by order batching : a comparative study.

This study is concerned with a common forecasting problem faced by organisations - lumpy demand, an infrequent and irregular demand pattern. The study attempts to carry out a comparative study between three forecasting methods, namely EWMA, Croston's Method and the research's proposed meth...

Full description

Saved in:
Bibliographic Details
Main Authors: Ong, Kok Guan., Teng, Poi Leng., Yong, Lee San.
Other Authors: Viswanathan, S.
Format: Final Year Project
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/11551
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-11551
record_format dspace
spelling sg-ntu-dr.10356-115512023-05-19T06:08:59Z Forecasting lumpy demand created by order batching : a comparative study. Ong, Kok Guan. Teng, Poi Leng. Yong, Lee San. Viswanathan, S. Nanyang Business School DRNTU::Business::Management::Forecasting This study is concerned with a common forecasting problem faced by organisations - lumpy demand, an infrequent and irregular demand pattern. The study attempts to carry out a comparative study between three forecasting methods, namely EWMA, Croston's Method and the research's proposed method, to determine which method produces optimum results based on forecast variation under different patterns of demand lumpiness. 2008-09-24T07:56:25Z 2008-09-24T07:56:25Z 2001 2001 Final Year Project (FYP) http://hdl.handle.net/10356/11551 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Business::Management::Forecasting
spellingShingle DRNTU::Business::Management::Forecasting
Ong, Kok Guan.
Teng, Poi Leng.
Yong, Lee San.
Forecasting lumpy demand created by order batching : a comparative study.
description This study is concerned with a common forecasting problem faced by organisations - lumpy demand, an infrequent and irregular demand pattern. The study attempts to carry out a comparative study between three forecasting methods, namely EWMA, Croston's Method and the research's proposed method, to determine which method produces optimum results based on forecast variation under different patterns of demand lumpiness.
author2 Viswanathan, S.
author_facet Viswanathan, S.
Ong, Kok Guan.
Teng, Poi Leng.
Yong, Lee San.
format Final Year Project
author Ong, Kok Guan.
Teng, Poi Leng.
Yong, Lee San.
author_sort Ong, Kok Guan.
title Forecasting lumpy demand created by order batching : a comparative study.
title_short Forecasting lumpy demand created by order batching : a comparative study.
title_full Forecasting lumpy demand created by order batching : a comparative study.
title_fullStr Forecasting lumpy demand created by order batching : a comparative study.
title_full_unstemmed Forecasting lumpy demand created by order batching : a comparative study.
title_sort forecasting lumpy demand created by order batching : a comparative study.
publishDate 2008
url http://hdl.handle.net/10356/11551
_version_ 1770564758670409728