Forecasting lumpy demand created by order batching : a comparative study.
This study is concerned with a common forecasting problem faced by organisations - lumpy demand, an infrequent and irregular demand pattern. The study attempts to carry out a comparative study between three forecasting methods, namely EWMA, Croston's Method and the research's proposed meth...
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Final Year Project |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/11551 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-11551 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-115512023-05-19T06:08:59Z Forecasting lumpy demand created by order batching : a comparative study. Ong, Kok Guan. Teng, Poi Leng. Yong, Lee San. Viswanathan, S. Nanyang Business School DRNTU::Business::Management::Forecasting This study is concerned with a common forecasting problem faced by organisations - lumpy demand, an infrequent and irregular demand pattern. The study attempts to carry out a comparative study between three forecasting methods, namely EWMA, Croston's Method and the research's proposed method, to determine which method produces optimum results based on forecast variation under different patterns of demand lumpiness. 2008-09-24T07:56:25Z 2008-09-24T07:56:25Z 2001 2001 Final Year Project (FYP) http://hdl.handle.net/10356/11551 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
topic |
DRNTU::Business::Management::Forecasting |
spellingShingle |
DRNTU::Business::Management::Forecasting Ong, Kok Guan. Teng, Poi Leng. Yong, Lee San. Forecasting lumpy demand created by order batching : a comparative study. |
description |
This study is concerned with a common forecasting problem faced by organisations - lumpy demand, an infrequent and irregular demand pattern. The study attempts to carry out a comparative study between three forecasting methods, namely EWMA, Croston's Method and the research's proposed method, to determine which method produces optimum results based on forecast variation under different patterns of demand lumpiness. |
author2 |
Viswanathan, S. |
author_facet |
Viswanathan, S. Ong, Kok Guan. Teng, Poi Leng. Yong, Lee San. |
format |
Final Year Project |
author |
Ong, Kok Guan. Teng, Poi Leng. Yong, Lee San. |
author_sort |
Ong, Kok Guan. |
title |
Forecasting lumpy demand created by order batching : a comparative study. |
title_short |
Forecasting lumpy demand created by order batching : a comparative study. |
title_full |
Forecasting lumpy demand created by order batching : a comparative study. |
title_fullStr |
Forecasting lumpy demand created by order batching : a comparative study. |
title_full_unstemmed |
Forecasting lumpy demand created by order batching : a comparative study. |
title_sort |
forecasting lumpy demand created by order batching : a comparative study. |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/11551 |
_version_ |
1770564758670409728 |