Pile settlement estimation from CAPWAP analysis
This dissertation is prepared for partial fulfillment of the requirements for the degree of Master of Science in Geotechnical Engineering. The main objective of this study is to assess the reliability of CAPWAP program in the estimation of load settlement behavior of pile.
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/11932 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Summary: | This dissertation is prepared for partial fulfillment of the requirements for the degree of Master of Science in Geotechnical Engineering. The main objective of this study is to assess the reliability of CAPWAP program in the estimation of load settlement behavior of pile. |
---|