Soil heave and pile heave caused by pile installation
Pile installation will lead to vertical and horizontal soil movements around the pile. The vertical soil movements will cause heave of piles which have already been installed in the vicinity. As a result, tensile force may be induced in the existing piles. The horizontal soil movements induced by pi...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/12235 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-12235 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-122352023-03-03T19:30:03Z Soil heave and pile heave caused by pile installation Gao, Shan Teh, Cee Ing School of Civil and Structural Engineering DRNTU::Engineering::Civil engineering::Geotechnical Pile installation will lead to vertical and horizontal soil movements around the pile. The vertical soil movements will cause heave of piles which have already been installed in the vicinity. As a result, tensile force may be induced in the existing piles. The horizontal soil movements induced by pile installation may also cause the deflection of existing piles and induce bending moments in such piles. Master of Engineering (CSE) 2008-09-25T06:41:03Z 2008-09-25T06:41:03Z 2000 2000 Thesis http://hdl.handle.net/10356/12235 en Nanyang Technological University 158 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Civil engineering::Geotechnical |
spellingShingle |
DRNTU::Engineering::Civil engineering::Geotechnical Gao, Shan Soil heave and pile heave caused by pile installation |
description |
Pile installation will lead to vertical and horizontal soil movements around the pile. The vertical soil movements will cause heave of piles which have already been installed in the vicinity. As a result, tensile force may be induced in the existing piles. The horizontal soil movements induced by pile installation may also cause the deflection of existing piles and induce bending moments in such piles. |
author2 |
Teh, Cee Ing |
author_facet |
Teh, Cee Ing Gao, Shan |
format |
Theses and Dissertations |
author |
Gao, Shan |
author_sort |
Gao, Shan |
title |
Soil heave and pile heave caused by pile installation |
title_short |
Soil heave and pile heave caused by pile installation |
title_full |
Soil heave and pile heave caused by pile installation |
title_fullStr |
Soil heave and pile heave caused by pile installation |
title_full_unstemmed |
Soil heave and pile heave caused by pile installation |
title_sort |
soil heave and pile heave caused by pile installation |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/12235 |
_version_ |
1759857018113359872 |