Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach
In PCB Assembly manufacturing environment, there are usually three objectives to achieve – minimizing setup cost, minimizing average cycle time, and minimizing job lateness. With the re-entrant trait of PCB Assembly system, scheduling job release is a complicated but crucial problem which p...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/12885 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-12885 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-128852020-11-01T11:30:14Z Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach Zuo, Jie Sivakumar, Appa Iyer School of Mechanical and Aerospace Engineering Singapore-MIT Alliance Programme DRNTU::Engineering::Manufacturing::Production management In PCB Assembly manufacturing environment, there are usually three objectives to achieve – minimizing setup cost, minimizing average cycle time, and minimizing job lateness. With the re-entrant trait of PCB Assembly system, scheduling job release is a complicated but crucial problem which plays an important role in improving the whole factory performance, maximizing factory production capability, minimizing waste and maximizing revenue. How to schedule jobs with dynamic queue to achieve the three objectives is where we focus on. Master of Science (Manufacturing Systems and Technology) 2008-05-28T09:11:05Z 2008-10-07T01:57:07Z 2008-05-28T09:11:05Z 2008-10-07T01:57:07Z 2007 2007 Thesis http://hdl.handle.net/10356/12885 en 50 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Manufacturing::Production management |
spellingShingle |
DRNTU::Engineering::Manufacturing::Production management Zuo, Jie Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach |
description |
In PCB Assembly manufacturing environment, there are usually three objectives to
achieve – minimizing setup cost, minimizing average cycle time, and minimizing
job lateness. With the re-entrant trait of PCB Assembly system, scheduling job
release is a complicated but crucial problem which plays an important role in
improving the whole factory performance, maximizing factory production capability,
minimizing waste and maximizing revenue. How to schedule jobs with dynamic
queue to achieve the three objectives is where we focus on. |
author2 |
Sivakumar, Appa Iyer |
author_facet |
Sivakumar, Appa Iyer Zuo, Jie |
format |
Theses and Dissertations |
author |
Zuo, Jie |
author_sort |
Zuo, Jie |
title |
Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach |
title_short |
Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach |
title_full |
Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach |
title_fullStr |
Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach |
title_full_unstemmed |
Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach |
title_sort |
multi-objective scheduling in pcb assembly manufacturing : discreet event simulation approach |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/12885 |
_version_ |
1688665267194822656 |