Developing industrial buildings using design-and-build contract
This report investigates into the characteristics, concepts, advantages, disadvantages and the process of design-and-build contracts. Two case studies were carried out. Case study 1 looked at the implementation of the design-and-build projects in the private sector. It was found that the owners were...
Saved in:
Main Author: | Lau, Kil Wee. |
---|---|
Other Authors: | Tiong, Robert Lee Kong |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/13078 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Application of design and build contracts in Singapore
by: Chia, Wai Mun., et al.
Published: (2009) -
A study of the important aspect on design and build contract
by: Fong, Hock Mun., et al.
Published: (2008) -
Japanese contractor's approaches in managing design and build contract in Singapore
by: Toh, Boo Hor.
Published: (2008) -
A study of buildability and productivity on design and build projects in the building industry
by: Yeo, Lock Hoe.
Published: (2008) -
Management contracting with design & build' procurement method adopted in public and private sector
by: Leaw, Yee Ching.
Published: (2008)